SCP-4074
Safe
~
medium confidence
SCP-4074
Expected annual
$750K
One-time setup
$738K
Annual recurring
$742K
Personnel
2.3
First-year one-time setup and contingencies are the main upfront drivers (~$737,500), while annual operating costs are dominated by personnel, applied research, and site overhead (~$741,500/year). Hydrogen-safety and potential scalability/incident response are key cost risks.
One-Time Capital Costs
Total: $738K
Annual Recurring Costs
Total: $742K/yr
Cost Scenarios
📊
Baseline
(baseline)
$742K/yr
Normal year with routine monitoring, consumables, staff wages, and modest maintenance; no major incidents or large-scale R&D expansions.
no_incidents
standard_operations
🚨
Minor Incident
$766K/yr
Small containment incident or equipment failure requiring repairs, extra testing, and incident response.
small_lab_accident
single_seed_release
minor_equipment_damage
🚨
Hydrogen Explosion Event
$1.0M/yr
Hydrogen ignition/ventilation failure causing fire/explosion damage and temporary relocation/repair of containment room.
nebula_ignition
ventilation_failure
electrical_spark
🚨
Propagation Scaling Event
$942K/yr
Accidental or intentional propagation requires rapid expansion of containment footprint, hiring, and extra recurring support.
uncontrolled_propagation
seed_escape
quarantine_breach
Personnel
2.3 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | [#9] Senior botanical lead researcher (full-time) responsible for SCP research and oversight. |
| Plant Technician | 1 | [#9] Full-time plant technician for husbandry and daily containment maintenance. |
| Lab Manager / Administrator (FTE) | 0.3 | [#9] Fractional lab manager (0.2–0.5 FTE) for administrative coordination, scheduling, and compliance. |
Confidence Notes
Estimates are drawn from analyst ranges in notes but many items have wide ranges (R&D scale, one-time contingency size, and hydrogen incident probability). Assumptions made about pursuing applied research and chosen midpoints reduce precision; unexpected incidents could materially change costs.