SCP-4104
Keter
?
low confidence
SCP-4104
Expected annual
$20.8M
One-time setup
$99.6M
Annual recurring
$16.7M
Personnel
76
Initial capital/setup costs are dominated by property acquisition, contingency reserves, and robotic/research program development (roughly $100M one-time); steady-state annual operations are driven by staff wages, research/monitoring programs and logistics (~$16.2M/yr). Main cost drivers are personnel (security and MTF), recurring research & monitoring, and large contingency reserves for catastrophic events.
One-Time Capital Costs
Total: $99.6M
Annual Recurring Costs
Total: $16.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$16.7M/yr
Normal operational year with steady monitoring, occasional small operations but no major incidents.
routine_monitoring
scheduled_training_and_research
minor_maintenance
🚨
Minor Incident
$17.4M/yr
Single-campus manifestation requiring evacuation, targeted destruction of a Penrose object, and limited remediation.
single_campus_manifestation
small_evacuations
single_penrose_destruction
🚨
Catastrophic Breach
$216.2M/yr
Large-scale propagation beyond campus requiring national-level response, mass evacuation, long-term resettlement and reconstruction.
city_scale_propagation
multiple_penrose_objects
mass_evacuations_and_reconstruction
Personnel
76 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 30 | [#1] 24/7 perimeter coverage with 2-hour rotations, hazard premium included. |
| MTF Agent / Operator | 16 | [#2] Dedicated Theta-90 rapid-response team (12–16 operators) for expeditions. |
| Research Scientist | 6 | [#24, #25] Mathematicians/topologists/physicists supporting research & simulation programs. |
| Data Analyst / Monitoring Analyst | 12 | [#5] Analysts for global monitoring, social/media triage and field liaisons. |
| Engineer / Maintenance | 4 | [#4, #22] Robotics/robot ops maintenance, vehicle and site systems engineers. |
| Medical Officer / Medic | 3 | [#13, #12] Field medics, medical screening oversight and medevac coordination. |
| Administrative Staff / Program Management | 4 | [#28, #6] Program managers, procurement, accounting and legal liaison support. |
| Site Director / Executive Staff | 1 | [#28] Senior oversight of containment program and external coordination. |
Confidence Notes
Estimates use midpoints and program-level allocations from analyst notes; many items have wide ranges and are highly location- and incident-dependent (property costs, frequency/scale of manifestations, and contingency drawdowns). Unknowns about SCP behavior and response frequency reduce confidence.