SCP-4111
Euclid
~
medium confidence
SCP-4111
Expected annual
$4.6M
One-time setup
$10.6M
Annual recurring
$4.5M
Personnel
10
Initial containment and research have a large upfront cost (~$10.6M) driven by specialized remote-exploration hardware, contingency reserves and facility/equipment buildout; ongoing annual costs (~$4.48M/yr) are driven by research staff, containment personnel, medical/recovery readiness, and intelligence/legal operations.
One-Time Capital Costs
Total: $10.6M
Annual Recurring Costs
Total: $4.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.5M/yr
Normal year with scheduled research, routine maintenance, controlled manufacture and no major incidents.
scheduled_research
routine_maintenance
no_breaches_or_exposures
🚨
Minor Incident
$4.7M/yr
Single field recovery or moderate exposure event requiring emergency mission, artifact appraisal and limited amnestic/medical response.
single_recovery_mission
local_artifact_discovery
limited_public_witnesses
🚨
Major Breach
$8.0M/yr
Unauthorized proliferation or significant equipment loss requiring major asset replacement, broad recovery ops and substantial legal/cover costs.
unauthorized_creation
theft_of_instances
major_ROV_loss
🚨
Political Exposure
$12.5M/yr
Significant public/political exposure or major discovery that forces large-scale cover-ups, settlements and rapid program expansion.
major_media_exposure
high-profile_discovery
legal_settlements
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Level-3 Supervisor | 1 | [#5] Senior containment/authorization supervisor included in specialist personnel salaries. |
| Level-2 Operator | 2 | [#5] Operators qualified to create/handle SCP-4111-1 and run activations. |
| Technician (handling & brine ops) | 2 | [#5] Technicians for handling, brine operations and maintenance. |
| Security Officer / MTF Agent | 5 | [#6] Vault and transport guards (4–6 FTE range; midpoint used) and rapid-reaction coverage. |
Confidence Notes
Analyst notes provide detailed line-item ranges; however many items have wide ranges (e.g., ROV capital, contingency funds, per-instance manufacture) and assumptions were required for production volume and contingency drawdowns, so estimates are moderately uncertain.