Expected annual
$16.5M
One-time setup
$22.8M
Annual recurring
$15.8M
Personnel
120
Initial capital/setup costs are estimated at approximately $22.81M, driven primarily by underground site build-out, BSL-4 lab/R&D setup and a dedicated contingency reserve. Annual recurring operations are roughly $15.78M/yr, dominated by specialized personnel (musicians, supervisors, MTF), power/facilities maintenance and ongoing research/monitoring.
One-Time Capital Costs
Total: $22.8M
Annual Recurring Costs
Total: $15.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.8M/yr
Normal operational year with continuous Auseuil protocol maintained and no major containment incidents.
continuous_music_maintained
routine_turnover_and_maintenance
🚨
Minor Incident
$16.8M/yr
Localized interruption or short-term failure (e.g., brief lapse in music, localized SCP-4140-2 manifestation) requiring emergency response, replacement musicians, small blocking operation and extra medical treatment.
temporary_protocol_interruption
small_blocking_operation
additional_medical_evacuations
🚨
Major Breach
$45.8M/yr
Significant spread of SCP-4140-2 requiring large-scale engineering interventions, large use of contingency capital, mass evacuations and extensive legal/cover-up operations.
runaway_SCP-4140-2_expansion
failure_of_Auseuil_protocol
large_scale_blocking_or_demolition
Personnel
120 total
| Role | Count | Notes |
|---|---|---|
| Musician (Tau-8) | 50 | [#8] On-payroll roster to support 15 on-site at all times with rotations; includes hazard pay and allowances. |
| Research Scientist / Technician | 8 | [#12, #20] R&D staff, lab technicians and analysts supporting BSL-4 work and monitoring. |
| Security Officer / MTF Agent | 27 | [#3, #23] Combined MTF Omicron-2 technical dive specialists (15) and on-site armed security guards (~12) to maintain perimeter and guide cave access. |
| Supervisory / Monitoring Staff | 30 | [#9] Shift supervisors, psychologists/psychiatrists, medics, sound technicians and overseers monitoring Tau-8. |
| Medical Officer | 4 | [#10] Medics and medical support for on-site care, medevac coordination and long-term monitoring. |
| Engineer / Maintenance | 6 | [#2, #4, #5, #7, #16] Structural, power, pump and remote-asset maintenance staff for underground facility and remote systems. |
| Administrative Staff | 3 | [#1, #19] Local liaison, legal/administrative and logistics coordinators. |
Confidence Notes
Many cost drivers are well-described (personnel, facilities, power) allowing medium confidence in recurring estimates; uncertainty remains around mortality rates, frequency/scale of blocking operations, and BSL-4 lab/contingency sizing which prevent high confidence.