SCP-4148 Insectoid ~ medium confidence
SCP-4148
Expected annual
$3.1M
One-time setup
$6.2M
Annual recurring
$3.0M
Personnel
21
Estimated one-time setup and capital costs total approximately $6.19M driven by land acquisition, containment dome, contingency reserves and laboratory buildout; ongoing operations are roughly $3.05M/year driven primarily by staff wages (security + scientific team), R&D/monitoring, and remediation/reserve funding.
🏗️ One-Time Capital Costs Total: $6.2M
Contingency Reserve $2.5M
[#28] Containment-failure / escalation reserve fund (capital set-aside).
Facilities $1.3M
[#1, #2, #3, #4, #15] Site acquisition, perimeter fencing installation, reinforced containment dome, airlocks and fixed hazard-mitigation installation (blast/foam/suppression systems).
Initial Research And Lab Setup $975K
[#19, #20, #27] Initial R&D program setup and micro-manipulation/imaging lab capital (micro-CT, microscopes, clean benches), and one-time major conservation intervention budget.
Decommissioning Relocation $600K
[#29] Budget for careful relocation/decommissioning operations (specialized lift/crates/transport).
Equipment $570K
[#5, #6, #9, #10, #12, #13, #23] HVAC/microclimate install, backup generator purchase, remote-monitoring hardware, high-speed instrumentation, vehicles/drones/robotics, initial PPE and initial secure data/archive hardware.
Major Conservation $150K
[#27] One-time major conservation/restoration work (large repair/stabilization).
Initial Cover Story Rollout $60K
[#22] One-time public relations/cover identity rollout (wildlife preserve/entomology station), initial community liaison expenses.
Sop Development $30K
[#26] Initial SOP development, training curriculum and documentation writing costs (one-time setup).
🔄 Annual Recurring Costs Total: $3.0M/yr
Staff Wages $1.5M/yr
[#8, #11] Combined recurring wages for 24/7 security staffing (12 guards) and scientific/research staff (entomologists, propulsion/materials scientists, technicians, site manager, data analyst).
Research And Monitoring $580K/yr
[#9, #10, #18, #19, #20, #23, #27] Ongoing sensor data storage & software, high-speed instrumentation calibration/consumables, hazardous-materials testing and environmental monitoring, ongoing R&D program funding, outsourced microscopy/analysis time, secure data operations, and periodic conservation work.
Remediation Reserve $300K/yr
[#25] Annual set-aside for incident cleanup and environmental remediation reserve funding.
Cover Story And Legal $200K/yr
[#22, #24] Annual cover-story operations, local liaison/PR/community outreach and legal/compliance retainers.
Logistics And Transport $140K/yr
[#12, #21] Maintenance/replacement for vehicles/drones/remote manipulators and recurring transport & recovery operations (containment crates, recovery teams, crane rentals).
Medical And Medevac $100K/yr
[#16] Contracted emergency medical/medevac capability and on-site trauma/extraction readiness (annual contracted cost).
Supplies And Consumables $85K/yr
[#13, #14, #30] Routine PPE consumables and entomology handling supplies, insect colony feeding/maintenance, and annual administrative/misc consumables overhead.
Facilities Maintenance $74K/yr
[#2, #5, #6, #7, #15] Perimeter fence seasonal maintenance, HVAC servicing and electricity portions, generator fuel/maintenance, site utilities (electric/water/waste) and firefighting system maintenance/training.
Forensic And Biohazard Disposal $50K/yr
[#17] Annual baseline contingency for forensic, mortuary and biohazard disposal services; per-incident costs handled in scenarios/incrementals.
Training And Drills $20K/yr
[#26] Recurring refresher training, emergency drills and SOP updates.
Cost Scenarios
📊 Baseline (baseline) $3.0M/yr
82.5% probability / year
Normal operational year with routine monitoring, experiments, and no major incidents.
no launches causing major damage routine R&D and monitoring standard maintenance and staffing
🚨 Minor Incident $3.1M/yr
15.0% probability / year +$75K vs baseline
Small launch/crash that requires extra recovery, forensic work and localized remediation but no public exposure.
small rocket crash/explosion minor contamination requiring sampling/recovery additional recovery missions
🚨 Major Breach $3.8M/yr
2.0% probability / year +$750K vs baseline
Significant crash/explosion causing environmental damage, interaction with local authorities and costly remediation/legal work.
large-scale crash visible environmental impact legal/agency involvement & remediation
🚨 Catastrophic Breach $8.0M/yr
0.5% probability / year +$5.0M vs baseline
Severe escalation with public exposure, large-scale environmental damage, potential relocation or major containment response.
public exposure / visible explosions wildfire or extensive environmental contamination need for large-scale remediation, payouts or relocation
👥 Personnel 21 total
Role Count Notes
Security Officer / MTF Agent 12 [#8] 24/7 multi-shift armed guard force (3 shifts) to secure perimeter and exclusion zone.
Research Scientist (Entomology) 1 [#11] Entomologist responsible for SCP-4148-1 study and colony management.
Research Scientist (Aerospace/Propulsion) 1 [#11] Aerospace/propulsion specialist for launch characterization and test design.
Research Scientist (Materials) 1 [#11] Materials scientist for artifact analysis and conservation.
Technician / Lab Technician 4 [#11] Technicians for sample prep, instrument operation, maintenance and PPE handling.
Site Manager / Executive Staff 1 [#11] Site manager responsible for operations, compliance and liaison.
Data Analyst 1 [#11, #23] Data analyst for high-speed imagery, sensor telemetry and secure archives.
📋 Confidence Notes
Many line items have wide ranges and depend on local land costs, frequency/severity of anomalous launches, and uncertain long-term behavior of SCP-4148-1; basic staffing and facility items are well-understood but incident frequency and remediation needs are uncertain.
← SCP-4147 ↑ All SCPs SCP-4149 →