SCP-4171
Euclid
?
low confidence
SCP-4171
Expected annual
$28.6M
One-time setup
$197.6M
Annual recurring
$27.7M
Personnel
8
High up-front capital (dominated by procurement of six Scranton Reality Anchors and spares) with large recurring maintenance and vendor-support costs; baseline annual operations are moderate but SRA maintenance can drive multi‑million recurring costs.
One-Time Capital Costs
Total: $197.6M
Annual Recurring Costs
Total: $27.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$27.7M/yr
Normal year of operations with routine maintenance, scheduled drills, and no major SRA failures or containment incidents.
routine_maintenance
scheduled_drills
vendor_support_engagements
🚨
Minor Incident
$27.8M/yr
Small containment/operational incident requiring overtime, minor repairs, investigation and short-term vendor work.
sensor_false_positive_or_tamper
minor_SRA_fault_requiring_fast_repair
🚨
Major Sra Failure
$32.7M/yr
One or more SRAs experience significant failure requiring emergency vendor replacement, on-site engineering, and degraded containment mitigations.
SRA_hardware_failure
prolonged_power_event
🚨
Catastrophic Breach
$57.7M/yr
Containment breach or large-scale SRA cascade failure resulting in legal liabilities, large-scale PR/cover operations, major equipment replacement, and casualty management.
full_containment_breach
multiple_SRA_failures
public_exposure_with_liabilities
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#6] Two on-site guards specified for containment monitoring. |
| HMCL Supervisor / Monitoring Operator | 1 | [#7] HMCL supervisor monitoring position with on-call premium. |
| Research Scientist | 1 | [#11] Senior researcher to run experiments and analysis (part of research FTEs). |
| Research Technician | 1 | [#11] Research technician support (part of the 1–3 FTE research team). |
| SRA Technician / Specialized Engineer | 3 | [#17] Specialized technicians / vendor-contracted staff required for SRA maintenance and emergency response. |
Confidence Notes
Large uncertainty driven by unknown SRA technology, wide capital and maintenance ranges, and contingent liability exposure. Estimates use mid-range assumptions for SRAs and reserves; true costs could be orders of magnitude different.