SCP-4175
Unknown
✓
high confidence
SCP-4175
Expected annual
$821K
One-time setup
$702K
Annual recurring
$810K
Personnel
10
One-time setup (~$702,000) driven by deconstruction/transport, vault retrofit, legal/contingency reserves and conservation; recurring costs (~$810,000/yr) driven primarily by 24/7 security and assigned MTF/research personnel plus site overhead and insurance.
One-Time Capital Costs
Total: $702K
Annual Recurring Costs
Total: $810K/yr
Cost Scenarios
📊
Baseline
(baseline)
$810K/yr
Normal year with routine operations, regular experiments, no major incidents.
routine_operations
scheduled_experiments
no_breach_events
🚨
Minor Incident
$860K/yr
Localized containment incident requiring contractor repairs, short-term relocation of staff, limited forensic follow-up and minor legal consultation.
minor_equipment_failure
localized_mold_outbreak
small_containment_breach
🚨
Major Breach
$1.1M/yr
Significant containment breach or discovery requiring emergency response, large-scale forensic investigation, legal exposure, incident relocation and public-affairs management.
major_containment_breach
public_exposure
emergency_relocation
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] 24/7 vault security: 2guards/shift × 3 shifts = 6 guards (on-site permanent), included in staff wages. |
| Research Scientist | 1 | [#9] Research lead / psychologist / paranormal researcher time included in assigned personnel costs. |
| MTF Operator / Specialist | 1 | [#9] Assigned MTF Psi-8 operator(s) and backups (ψ-8 Maria Hayes allocation) included in personnel costs. |
| Engineer / Maintenance | 1 | [#9] Systems engineer for plumbing, monitoring and facility systems (part of assigned personnel costs). |
| Administrative Staff | 1 | [#9] Administrative/protocol support time allocated to experiments and documentation (portion of assigned personnel costs). |
Confidence Notes
Analyst notes provide line-item estimates and recommended mid-range values for nearly all costs (security staffing, retrofit, transport, legal, contingency), so totals are well-founded at planning level; residual uncertainty remains in event probabilities and insurance pricing but overall confidence is high.