SCP-4186
Neutralized
~
medium confidence
SCP-4186
Expected annual
$4.3M
One-time setup
$7.4M
Annual recurring
$4.2M
Personnel
19
One-time capital and decommissioning costs are approximately $7.44M driven by facility purchase, sensors/UAV/lab kit, and a large crisis contingency reserve; annual recurring operations cost about $4.17M/yr driven primarily by staff wages, monitoring subscriptions and legal/PR/liaison costs.
One-Time Capital Costs
Total: $7.4M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Normal operational year with routine monitoring, recoveries, and no large incidents.
daily GLADYS events
routine recoveries
no significant contamination or legal escalations
🚨
Minor Incident
$4.3M/yr
Small contamination or hazardous package requiring EOD callouts, extra remediation and legal/PR work.
EOD callout
localized decontamination
small-scale PR/legal response
🚨
Major Breach
$4.9M/yr
Significant contamination or multi-site events requiring broad remediation, replacement equipment, extended legal/liaison and PR operations.
widespread contamination
multiple recoveries/responses
major PR/legal escalation
🚨
Research Scale Up
$5.7M/yr
Decision to significantly expand research and containment capacity (new lab capability, hires, and specialized field assets).
need for advanced analysis
policy decision to neutralize/scale research
discovery of novel risk factors
Personnel
19 total
| Role | Count | Notes |
|---|---|---|
| Rapid Response / Field Operative | 10 | [#7] Field operatives for recovery/cordon/recovery duties (standby shift staffing reflected in staff wages). |
| Research Scientist | 4 | [#8] Atmospheric scientists, chemists, and forensic analysts (specialist research staff accounted in staff wages). |
| Security Officer / MTF Agent | 3 | [#16] Guard force / security posts for facility access control (annual guard costs included in staff wages). |
| Administrative Staff | 2 | [#15, #17] Administrative, logistics and liaison support (scheduling, permits, contract management included in staff wages). |
Confidence Notes
Estimates derived from analyst-provided ranges and midpoints; many line items are wide ranges (facility purchase vs lease, contingency reserve, incident costs) and contingent on posture choices, so confidence is medium.