Expected annual
$22.4M
One-time setup
$13.7M
Annual recurring
$22.0M
Personnel
20
Upfront capital and contingency reserves are significant (~$13.7M one-time) for site acquisition, engineering and secure vaults; annual operating costs are dominated by corporate embedding, PR/legal programs and reimbursement to commercial partners (~$22.0M/yr).
One-Time Capital Costs
Total: $13.7M
Annual Recurring Costs
Total: $22.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$22.0M/yr
Normal operational year with no major incidents; all routine cover, embedding, security, monitoring and commercial reimbursements proceed as budgeted.
no major breaches
stable corporate cooperation
🚨
Minor Incident
$23.5M/yr
Localized unauthorized sampling, small PR leak, or limited replication attempt requiring field interdiction and elevated PR/legal activity.
unauthorized sampling detected
small-scale public exposure
local legal challenge
🚨
Major Breach
$32.0M/yr
Significant public exposure, large-scale replication or environmental dispersal requiring buyouts, emergency remediation, legal settlements and major PR/corporate interventions.
large-scale public leak
successful replication attempts
major environmental release
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#3] On-site guards to staff 24/7 shifts; local hires to prevent unauthorized approach and protect equipment. |
| Security Supervisor | 2 | [#3] Supervisors/shift leads coordinating guard rotations and incident response. |
| Research Scientist | 6 | [#9] Geologists, chemists and technical staff maintaining instruments, sampling and producing reports used in public/academic outlets. |
Confidence Notes