SCP-4228
Safe
~
medium confidence
SCP-4228
Expected annual
$2.0M
One-time setup
$21.4M
Annual recurring
$2.0M
Personnel
12
First-year (one-time) costs are dominated by infrastructure, legal retainer/reserves, and a large contingency reserve, totaling roughly $21.37M. Ongoing annual costs are approximately $1.98M/yr driven primarily by staffing (security and research), digital monitoring/takedown, legal obligations, and facility overhead.
One-Time Capital Costs
Total: $21.4M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal, uneventful year with containment intact and no major leaks.
no leaks
routine maintenance
regular training/drills
🚨
Minor Incident
$2.1M/yr
Limited external dissemination of metadata or a small leak requiring targeted takedowns, PR action, and modest amnestic/medical response.
small public post/uploads
localized exposure
targeted takedown & PR
🚨
Major Breach
$7.0M/yr
Significant leak with many exposures requiring mass amnestic deployment, extended suppression efforts, large legal settlements and extended medical care.
widespread leak
multiple public exposures
mass amnestic distribution
🚨
Catastrophic Exposure
$102.0M/yr
Uncontrolled mass dissemination across a city/region/nation requiring prolonged emergency response, mass medical care, and systemic remediation.
nation-level spread
persistent replication via metadata
failure of suppression options
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] 24/7 vault guards: two-person minimum per shift, three shifts = 6 total guards. |
| Research Scientist | 2 | [#11] Two senior memetics researchers on the dedicated containment/research team. |
| Technician | 2 | [#11] Two technicians supporting memetics research and containment operations. |
| Administrative Staff | 2 | [#27] One containment officer/manager and one records clerk for approvals, logs, and audits. |
Confidence Notes
Estimates are drawn directly from detailed analyst line items; recurring staffing, monitoring, and legal costs are well-specified. Large-scale leak contingency and probability estimates are inherently uncertain due to the memetic nature of the object, so top-end contingency sizing and breach probabilities are approximate.