SCP-4269 Safe ✓ high confidence
SCP-4269
Expected annual
$19K
One-time setup
$24K
Annual recurring
$18K
Personnel
0.3
Estimated one-time startup of $24,200 driven by locker, sterilization equipment and initial administrative/compliance setup; recurring annual costs of $18,300 driven primarily by fractional containment technician wages, consumables, maintenance and minor admin/security.
🏗️ One-Time Capital Costs Total: $24K
Equipment $8K
[#4, #5] Ultrasonic cleaner and bench autoclave/sterilizer purchase and setup.
Facilities $5K
[#1] Purchase and installation of a standard anomalous-item locker.
Tamper Detection And Alarm Integration $2K
[#2] Door/window contact sensors, tamper seals and alarm/access-control relay integration for locker.
Incident Contingency Reserve $2K
[#21] One-time emergency decontamination / replacement reserve fund.
Cleaning Workstation $2K
[#3] Stainless work surface, sink/portable wash station, splash guard and storage for disinfectants.
Hr Compliance Review $2K
[#18] HR/ethics/sexual-content sensitivity review and legal sign-off (one-time review).
Training Initial $1K
[#10] Initial PPE & competency training for handlers (materials and instructor time).
Inventory Control Setup $1K
[#15] Initial inventory/chain-of-custody setup (software license or logbooks).
Initial Ppe $500
[#6] Initial bulk purchase of single-use gloves, aprons, face shields.
Pr Cover Setup $500
[#19] Initial PR/cover-story/redaction administration setup.
Final Disposal Per Event $200
[#22] Cost per disposal/destructive neutralization event (incineration/secure destruction).
Initial Research And Lab Setup $0
[]
🔄 Annual Recurring Costs Total: $18K/yr
Staff Wages $12K/yr
[#11] Fractional containment technician labor (prorated FTE for retrieval, cleaning, inspections, recordkeeping).
Supplies And Consumables $1K/yr
[#7] Disinfectants, wipes, soap, glove replenishment, biohazard bags and routine consumables.
Cleaning Contract Labor $1K/yr
[#12] Per-handling or outside technician cleaning labor budget (~$1,000/yr assumed volume).
Equipment Maintenance And Calibration $1K/yr
[#13] Annual service/calibration for ultrasonic cleaner and autoclave (if present).
Biohazard Waste Pickup $500/yr
[#8] Contractor removal of contaminated disposables / medical waste.
Spares And Replacements $500/yr
[#14] Spare parts and replacement items degraded by cleaning/handling.
Psychological Support $500/yr
[#20] Counseling availability for staff handling sexually explicit/intimate material.
Security And Admin Overhead $300/yr
[#17] Incremental alarm monitoring, access approvals and administrative time.
Hr Compliance Monitoring $300/yr
[#18] Ongoing compliance monitoring and minor legal/HR follow-up.
Cover Story And Legal $200/yr
[#19] Annual PR/cover-story monitoring and minimal legal/redaction maintenance.
Laundry Textile Sterilization $200/yr
[#9] Contract laundry or in-house washer/dryer usage for contaminated cloths/covers.
Training Refresher $200/yr
[#10] Annual refresher training for handlers.
Inventory Control Recurring $200/yr
[#15] Annual license/maintenance or ledger upkeep for inventory/chain-of-custody.
Utilities Minor $200/yr
[#16] Incremental water/electricity for cleaning cycles and equipment runtime.
Facilities Maintenance $0/yr
[]
Research And Monitoring $0/yr
[]
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $18K/yr
94.5% probability / year
Normal year with routine handling, no incidents.
routine_handling scheduled_maintenance
🚨 Minor Incident $21K/yr
5.0% probability / year +$3K vs baseline
Small unauthorized handling or contamination event requiring deep decontamination and limited replacement.
unauthorized_short-term_use localized_contamination
🚨 Major Breach $33K/yr
0.5% probability / year +$15K vs baseline
Significant misuse, extended unauthorized retention, loss or staff-related incident requiring investigation, replacement and legal/HR action.
prolonged_unauthorized_use loss_or_destruction formal_investigation
👥 Personnel 0.3 total
Role Count Notes
Containment Technician 0.3 [#11] Fractional FTE assigned for retrieval, cleaning, inspections and recordkeeping (prorated labor cost included in staff_wages).
📋 Confidence Notes
Item is a mundane Safe-class anomalous object with well-defined handling requirements and detailed line-item estimates in analyst notes; costs are small-scale and based on common facility/equipment prices, so estimates are high confidence.
← SCP-4268 ↑ All SCPs SCP-4270 →