SCP-4271
Keter
~
medium confidence
SCP-4271
Expected annual
$21.3M
One-time setup
$148.7M
Annual recurring
$21.0M
Personnel
61
Estimated one-time startup capital is $148,745,000, driven largely by contingency for large-scale geophysical intervention and initial R&D/containment reserves. Recurring annual baseline operating costs are $20,987,500, driven primarily by ongoing R&D, staffed research/security, and monitoring/maintenance.
One-Time Capital Costs
Total: $148.7M
Annual Recurring Costs
Total: $21.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$21.0M/yr
Normal year with ongoing monitoring, staffed research and modest R&D activity; no major incidents or public exposures.
steady monitoring and R&D
no breach or public incident
🚨
Minor Incident
$22.0M/yr
Localized containment incident or public approach requiring surge security, emergency research burst, PR response and limited compensation.
small-scale fragmentation event
public sighting or road incursion
🚨
Major Breach
$31.0M/yr
Significant containment breach or geophysical event requiring large mobilization, major emergency research, expanded PR/legal actions and substantial community disbursements.
large fracture/expansion event
public mass exposure or sustained seismic activity
Personnel
61 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | Per-note staffing example: 12guards + 3 supervisors; loaded cost ~$70k/yr each (total ~$1.05M) [#3]. |
| Research Scientist | 20 | Senior scientists performing geophysics, materials, biology and modeling; loaded avg ~$150k/yr per scientist [#14]. |
| Research Technician / Lab Assistant | 12 | Support staff for laboratory operations and field sensor maintenance; loaded avg ~$80k/yr [#14]. |
| Operations & Support (site techs, IT, medics, admin) | 14 | Combined operations/support workforce (site maintenance, IT/data engineers, medics, administrative staff); aggregated to match ops/support payroll (~$1.1M/yr) [#15]. |
Confidence Notes
Analyst notes provide detailed line-item ranges for nearly all costs, allowing a medium-confidence estimate; however very large uncertainties remain around high-end contingencies (deep drilling, international geophysical interventions) and long-term R&D intensity, so totals could vary widely if those paths are chosen.