SCP-4279
Safe
~
medium confidence
SCP-4279
Expected annual
$1.7M
One-time setup
$1.7M
Annual recurring
$1.6M
Personnel
8
Initial one-time setup estimated at approximately $1.68M driven primarily by vault construction, specialized equipment and decommissioning; ongoing annual operations are roughly $1.62M/year dominated by staff wages, a contingency reserve, and recurring range/contractor expenses.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Uneventful year with no major tests or incidents; routine staffing, monitoring and reserves maintained.
no off-site tests
routine monitoring
no incidents
🚨
Minor Test Campaign
$1.8M/yr
One off-site test campaign conducted with associated range rental, transport, contractors and disposal.
off-site test campaign
range rental and contractors
disposal of produced items
🚨
Major Breach
$2.6M/yr
Containment breach or accidental production/disposal event requiring large-scale remediation, public-health response and long-duration cleanup.
containment breach
radiological release
public exposure
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Senior Research Scientist / Lead Physicist | 1 | Lead oversight and approval authority for alterations/activations; salary component of staff_wages. [#6] |
| Research Technician | 2 | Lab technicians specialized in high-energy apparatus and handling heavy components. [#6] |
| Security Officer / MTF Agent | 4 | Armed security detail for 24/7 vault protection and transport escorts. [#6] |
| Administrative Staff | 1 | Logistics, scheduling, permits and cover-story liaison; included in aggregated staff wages. [#6] |
Confidence Notes
Analyst notes are detailed with line-item ranges, but many parameters (radiation classification, test frequency, disposal volumes, and whether equipment is purchased vs rented) remain uncertain; estimates use mid-range assumptions.