SCP-4388
Euclid
~
medium confidence
SCP-4388
Expected annual
$3.2M
One-time setup
$22.5M
Annual recurring
$3.2M
Personnel
19
Initial capital outlay is dominated by specialized underground cryogenic construction, full‑spectrum shielding and site electrical upgrades (~$22.5M). Annual operating costs (~$3.165M/yr) are led by staff wages, energy to run cryogenics/vacuum and recurring reserves/maintenance.
One-Time Capital Costs
Total: $22.5M
Annual Recurring Costs
Total: $3.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.2M/yr
Normal year with routine maintenance, monitoring and no major containment incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$3.6M/yr
Localized electrical discharge or equipment failure requiring emergency response, limited repairs and downtime.
arc_flash_event
local_equipment_failure
🚨
Major Breach
$4.7M/yr
Significant containment failure causing equipment destruction, larger repairs, public mitigation and reserve drawdown.
large_energy_release
major_equipment_damage
🚨
Catastrophic Breach
$13.2M/yr
Rare catastrophic energy release with large‑scale damage, mass amnestics, extensive reconstruction and reserve replenishment.
uncontrolled_closed_circuit
seismic_triggered_release
Personnel
19 total
| Role | Count | Notes |
|---|---|---|
| Containment Engineer / Technician | 7 | [#13] Electrical engineers, cryogenics technicians, EM specialists and seismic engineers providing 24/7 technical oversight and maintenance. |
| Security Officer / MTF Agent | 12 | [#14] Armed site guards and supervisors covering multiple shifts, training and escort duties. |
Confidence Notes
Estimates are built from analyst ranges in containment notes and the article; core capital items and recurring categories are well described but many anomalous risks (scale of energy releases, incident frequency) remain uncertain, so figures are medium confidence.