SCP-4394
Euclid
~
medium confidence
SCP-4394
Expected annual
$2.3M
One-time setup
$1.9M
Annual recurring
$2.2M
Personnel
13
Initial one-time setup ~ $1.88M driven by construction of two secure humanoid cells, BSL lab upgrades and research/containment equipment; steady-state recurring costs ~ $2.23M/yr dominated by staff wages, ongoing R&D/monitoring, security and long-term care contingencies.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal year with steady operations, routine maintenance, no major incidents.
no_incident
routine_operations
🚨
Minor Incident
$2.4M/yr
Small-scale theft attempt, limited diversion or accidental release requiring emergency response, limited legal/forensic work and consumable replacement.
attempted_theft
inventory_discrepancy
localized_contamination
🚨
Major Breach
$3.7M/yr
Successful diversion or multiple-person conversion resulting in public exposure, large legal settlements, mass incident response and accelerated containment R&D.
organized_theft
multiple_conversions
public_exposure
🚨
Research Breakthrough Requiring Scale Up
$3.2M/yr
Discovery prompting large-scale R&D and capital investment to pursue reversal or therapeutic deployment.
promising_reversal_candidate
require_clinical_scale_trials
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] 24/7 rotating armed/unarmed guard presence to prevent theft/diversion; included in staff wages. |
| Research Scientist | 2 | [#13] R&D staff to conduct analytic profiling and experiments; salaries included in staff wages. |
| Medical Officer | 2 | [#9] On-site/consulting physicians/nurses and psychiatric consults for routine checks and addiction management; included in staff wages. |
| Engineer / Maintenance | 1 | [#3, #6] Facility/HVAC and lab equipment maintenance and calibration; included in staff wages. |
| Administrative Staff | 1 | [#10, #18] Inventory, compliance, and liaison duties; included in staff wages. |
| Monitoring & Lab Technician | 1 | [#23] Continuous telemetry, CCTV and assay monitoring; included in staff wages. |
Confidence Notes
Estimates derived from analyst ranges in supplied notes; many items have wide ranges (site-dependent construction, R&D scope, legal/settlement variability) so totals are best-effort mid-range picks rather than firm quotes.