SCP-4408
Safe
~
medium confidence
SCP-4408
Expected annual
$3.6M
One-time setup
$4.9M
Annual recurring
$2.9M
Personnel
11
Initial capital outlays are dominated by contingency reserves, an operations base, airspace monitoring hardware, and equipment/vehicle purchases (~$4.92M one-time). Annual operations are driven by staffed 24/7 monitoring, enforcement/SAR contracts, logistics for insertions, and legal/cover operations — baseline recurring costs ≈ $2.92M/yr.
One-Time Capital Costs
Total: $4.9M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Minimal posture year with limited (≈2) in‑field missions, maintained operations base, contracted enforcement/SAR standby, and routine monitoring/cover activities.
limited_missions
steady_enforcement_contracts
routine_monitoring_and_PR
🚨
Monthly Explorations
$4.5M/yr
Active posture with monthly manned insertions (12 missions/yr), driving much higher logistics, SAR standby, equipment attrition, and lab analysis.
monthly_manned_insertions
high_insertion_tempo
increased_equipment_attrition
🚨
Minor Incident
$3.5M/yr
A small civilian incident or unplanned aircraft penetration requiring expanded SAR, legal response, PR, and compensation, but no large‑scale exposure.
civilian_incident
unplanned_aircraft_entry
localized_media_coverage
🚨
Catastrophic Containment
$10.9M/yr
Low‑probability, high‑impact event: discovery of an extrinsic exit or major public exposure requiring national asset mobilization, large settlements, and emergency containment.
extrinsic_exit_discovered
major_public_exposure
national_asset_mobilization
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Air Traffic Liaison / Monitoring Operator | 6 | [#2] Three shifts × 2 operators per shift to provide 24/7 monitoring; fully burdened staff costs included in staff_wages. |
| Monitoring Supervisor / Liaison | 1 | [#2] Supervisory / liaison role to coordinate with civil ATC and international operators; included in staff_wages supervisory allocation. |
| Research Scientist | 3 | [#17] Long‑term research staff (geologists, glaciologists, mission planners) included in research salary line. |
| Technician / Lab Technician | 1 | [#17] Technical support for mapping, sample handling, instrument maintenance; included in staff_wages. |
Confidence Notes
Estimates are built from analyst ranges and representative midpoints; SCP notes specify many variable per‑mission and contingent costs (wide ranges). Items like contingency reserves, choice of ADS‑B vs primary radar, and mission tempo introduce uncertainty, so medium confidence is appropriate.