SCP-4420 Unknown ? low confidence
A Potato Thirst
Expected annual
$47.4M
One-time setup
$963.0M
Annual recurring
$43.0M
Personnel
104
One-time setup and hardening dominate costs (~$963M) for a purpose-built containment module, stabilizers and reserves; recurring annual operations (power, maintenance, staff, remediation readiness) run roughly $43M/year, with potential incident-driven spikes into the hundreds of millions or more.
🏗️ One-Time Capital Costs Total: $963.0M
Facilities $509.0M
[#1, #11] Site construction/hardening for Module #819 (excavation, sealed shell, buffer) and initial sterile-zone earthworks/sealing.
Stabilizers Procurement $200.0M
[#3] Procurement/installation of four Scranton–Marlowe Topology Stabilizers (procurement, installation, calibration).
Incident Contingency Reserve $100.0M
[#22] Incident/containment-breach reserve fund (recommended allocation).
Pocket Dimension Interface $42.5M
[#2] Pocket-dimension interface hardware and installation (frame, coupling, certified airlocks).
Robotics Purchase $35.0M
[#9] Robotics and remote manipulators fleet and custom tooling (purchase).
Waste Handling Facility $30.0M
[#13] High-capacity secure incinerators/sterilizers and thaumic neutralization for potato matter.
Environmental Remediation Reserve $15.0M
[#16] Environmental remediation contingency reserve (recommended hold for cleanup events).
Backup Power Installation $7.5M
[#6] Backup generators, fuel storage, UPS/battery installation (N+1 redundancy).
Utility Connection Upgrade $6.0M
[#5] Utility connection upgrades (high-capacity feed upgrades) if required.
Neutralization Initial Allocation $5.0M
[#25] Initial allocation for long-term neutralization & termination program (prototype engineering kickoff).
Logistics Procurement $3.0M
[#26] One-time procurement/contracts for heavy-transport/cranes/airlift certifications.
Ir Inspection Suite $1.8M
[#8] IR/spectral camera suites and non-visible inspection gear (purchase).
Environmental Monitoring Setup $1.8M
[#14] On-site and regional environmental/groundwater monitoring network setup (samplers, instruments).
Vehicles And Equipment $1.8M
[#20] Vehicles and secure transport equipment one-time procurement.
Initial Research And Lab Setup $1.2M
[#17] Initial specialized lab fit-out for anomalous botany/memetics/thaumaturgy.
Electromagnetic Control Systems $1.1M
[#7] Visible-spectrum blackout/filtered-light installations, spectrally safe lamps and interlocks.
Pest Control Initial Establishment $1.1M
[#12] Initial specialized pest eradication/entomology establishment (sterile-insect releases, fumigation capability).
Legal Retainer $625K
[#21] Initial legal/public-relations retainer and one-time cover-up setup costs.
Water Contingency Stockpile $600K
[#15] One-time stockpile/logistics for regional water contingency and replacement supplies.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $43.0M/yr
Facilities Maintenance $20.5M/yr
[#4, #5, #6, #7, #11, #13] Continuous power (electricity), stabilizer maintenance/calibration, backup power fuel & upkeep, sterile-zone cleaning, EM/lighting replacements, waste facility operations.
Staff Wages $9.0M/yr
[#10, #17, #19, #20] Salaries for research staff, robotics operators, medical personnel, security force and core on-site staff.
Cover Story And Legal $2.8M/yr
[#21] Annual legal, PR, compensation and municipal liaison budgets.
Supplies And Consumables $2.4M/yr
[#10, #23, #28] Robotics spares/software updates, specialized PPE & non-organic consumables, petty cash/consumable emergency buys.
Neutralization Program Followon $2.0M/yr
[#25] Recommended ongoing R&D follow-on funding for neutralization/termination efforts.
Memetic Mitigation And Mental Health $1.8M/yr
[#18] Memetic countermeasures, community mental-health programs, staff inoculation and outreach.
Research And Monitoring $1.6M/yr
[#14, #17] Ongoing environmental monitoring/analysis and research lab consumables (anomalous botany, memetics, thaumaturgy experimentation).
Training Rotation And Hazard Pay $1.2M/yr
[#24] Regular training, rotation costs, hazard pay and psychological screening.
Logistics And Transport $1.2M/yr
[#15, #26] Regional water contingency readiness/logistics and annual logistics operations/heavy-transport contracts.
Pest Control Operations $300K/yr
[#12] Annual pest control operations and monitoring for anomalous insect populations.
Monitoring And Auditing Compliance $300K/yr
[#27] Monitoring, auditing and municipal/regulatory compliance payments.
Cost Scenarios
📊 Baseline (baseline) $43.0M/yr
90.8% probability / year
Normal operational year with no major incidents; routine maintenance, staffing, monitoring and small consumables usage.
no containment breaches routine maintenance standard monitoring
🚨 Minor Incident $48.0M/yr
8.0% probability / year +$5.0M vs baseline
Localized containment event or generation spike requiring emergency response, limited remediation, temporary overtime and legal outreach.
localized water contamination event small off-site spread temporary stabilizer downtime
🚨 Major Breach $243.0M/yr
1.0% probability / year +$200.0M vs baseline
Significant containment breach or accelerated generation event causing widespread contamination and requiring large-scale remediation and reserve drawdown.
stabilizer failure large-scale water transformation regional contamination
🚨 Catastrophic Breach $1.0B/yr
0.2% probability / year +$1.0B vs baseline
Extensive uncontrolled generation or containment loss with long-term regional impact demanding billion-dollar scale emergency response and infrastructure replacement.
complete stabilizer cascade failure persistent accelerated growth widespread civilian exposure and infrastructure loss
👥 Personnel 104 total
Role Count Notes
Research Scientist 22 [#17] Anomalous botany, memetics and thaumaturgy researchers (bench scientists conducting experiments and monitoring).
Senior Researcher / Thaumaturge 4 [#3, #17] Senior staff for stabilizer integration, memetic analysis and R&D leadership.
Security Officer / MTF Agent 50 [#20] 24/7 perimeter and internal security, rapid-response containment teams.
Engineer / Maintenance 10 [#4, #6] Mechanical/thaumaturgic engineers for stabilizer maintenance, power systems and facility upkeep.
Robotics Technician / Operator 9 [#9, #10] Operators and technicians for remote manipulators, robotic fleet operation and spares management.
Medical Officer 4 [#19] On-site medical staff including psychiatry for memetic cases and decontamination support.
Administrative Staff 4 [#21, #27] Administrative, logistics and municipal liaison staff supporting cover operations and compliance.
Site Director / Executive Staff 1 [#1, #21] Site-level executive oversight and incident command.
📋 Confidence Notes
Estimates use wide ranges given in analyst notes and the anomalous, poorly predictable behavior of SCP-4420 (generation rates, memetic effects, and breach severity). Large single-event costs are highly uncertain; therefore confidence is rated low.
← SCP-4419 ↑ All SCPs SCP-4421 →