SCP-4431
Unknown
~
medium confidence
SCP-4431
Expected annual
$20.9M
One-time setup
$234.3M
Annual recurring
$14.8M
Personnel
40
Estimated one-time capital costs are approximately $234.35M driven primarily by Research Station-05 construction and an optional deep-drilling campaign; recurring annual operations are about $14.85M driven by personnel, logistics, power, and monitoring.
One-Time Capital Costs
Total: $234.3M
Annual Recurring Costs
Total: $14.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.8M/yr
Normal year with no major incidents; routine monitoring, operations, research and occasional small deployments.
bimonthly SCP-4431-B manifestations at expected rate
no major station damage
no large-scale media exposure
🚨
Minor Incident
$19.9M/yr
Significant manifestation(s) or localized damage requiring extra MTF activity, emergency repairs, increased logistics and PR response.
multi-instance SCP-4431-C manifestation
localized infrastructure damage
civilian witness events requiring expanded amnestics/PR
🚨
Deep Drilling Attempt
$114.8M/yr
Authorized full-scale campaign to drill to SCP-4431-A (3,400m), incurring very large one-time campaign costs and specialized logistics.
approval to fund deep drilling campaign
multi-year science directive
urgency from new anomalous data
Personnel
40 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 12 | [#3] Research staff conducting on-site experiments, sample processing and field studies. |
| Engineer / Maintenance | 8 | [#3] Station engineers and maintenance technicians (power plant, vehicles, drilling equipment upkeep). |
| Technician | 8 | [#3] Lab technicians, field technicians and drilling support staff. |
| Medical Officer | 2 | [#3] On-site medics and medical support for rotations and emergencies. |
| Security Officer / Site Security | 6 | [#3] On-site security personnel responsible for perimeter, access control and short-term containment until MTF arrives. |
| Station Manager / Executive Staff | 1 | [#3] Site director / station leadership and coordination. |
| Administrative Staff | 3 | [#3] Logistics, procurement, and administrative coordination for station operations. |
Confidence Notes
Line-item estimates are provided in analyst notes and map directly to costs, but mission tempo (manifestation frequency, MTF deployments) and optional deep-drilling decisions introduce material uncertainty.