SCP-4432
Euclid
~
medium confidence
SCP-4432
Expected annual
$1.7M
One-time setup
$751K
Annual recurring
$1.7M
Personnel
10
Initial setup is dominated by containment room construction, specialized research instrumentation, and contingency reserves (~$751k one-time). Annual costs are personnel-driven (security, researchers, medical) plus readiness, research, and cover-story/legal obligations (~$1.72M/yr).
One-Time Capital Costs
Total: $751K
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal operational year with no containment incidents beyond routine maintenance and scheduled research.
routine_operations
scheduled_research
no_incidents
🚨
Minor Incident
$1.8M/yr
Localized containment failure requiring short MTF/medical response, minor repairs, increased temporary monitoring and cover activity.
restraint_failure
localized_containment_breach
minor_medical_event
🚨
Major Breach
$3.2M/yr
Significant containment breach or exposure requiring large-scale MTF deployment, facility repairs, extended medical treatment, and major cover-up/legal action.
full_containment_breach
public_exposure
subject_escape
🚨
Research Breakthrough Requiring Scale Up
$2.0M/yr
Discovery of additional anomalous properties necessitates expanded research program, recurring contracted imaging, and additional staff/higher security tempo.
new_anomalous_property_discovered
increased_research_tempo
contracted_imaging
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Six full-time guards covering 3x8hr shifts for 24/7 posted security (matches recurring security wage estimate, #6). |
| Security Supervisor / Sergeant | 1 | One Level-3/Sergeant on-site or on-call for escalations and authorizations (#7). |
| Research Scientist / Handler | 2 | Two researchers/handlers for daily interaction, protocol testing and documentation (#8). |
| Medical Officer / Medic | 1 | Aggregated on-call physician/medic coverage budgeted as recurring medical support (#9). |
Confidence Notes
Analyst notes provide detailed line-item ranges and staffing assumptions but the object's anomalous properties are unspecified; contingency lines are large and could materially change estimates, so overall confidence is medium.