SCP-4484
Euclid
~
medium confidence
SCP-4484
Expected annual
$3.4M
One-time setup
$4.4M
Annual recurring
$3.2M
Personnel
10.5
Initial one-time setup is substantial (~$4.43M) driven by lab build, contingency reserves, vehicles and specialized equipment; ongoing annual operations are estimated at ~$3.245M/yr driven by staff, cyber/research tooling, takedown/legal budgets, and veterinary/kennel costs.
One-Time Capital Costs
Total: $4.4M
Annual Recurring Costs
Total: $3.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.2M/yr
Normal year with steady monitoring, routine takedowns, scheduled research and operations.
steady stream activity
routine field ops and monthly takedowns
🚨
Minor Incident
$3.5M/yr
Localized increase in activity requiring several elevated takedowns, extra legal filings and modest surge in field ops.
single large takedown campaign
localized leak requiring PR/legal surge
🚨
Major Breach
$4.2M/yr
High-profile exposure or legal escalation requiring extended legal defense, larger multi-jurisdiction operations and settlements.
public leak / media exposure
multi-jurisdiction litigation
🚨
Widespread Escalation
$6.2M/yr
SCP demonstrates rapid geographic spread or technical sophistication requiring rapid scale-up (large labs, many field teams, replenished contingency).
rapid international spread
systemic technical escalation
Personnel
10.5 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Junior Researchers | 4 | [#1] Junior researchers assigned to stream monitoring and tagging. |
| Site Research Coordinator / Level 3 | 1 | [#1] Senior coordinator oversight. |
| Data Scientist / Analyst | 1 | [#1] Data scientist for chat analysis and tooling oversight. |
| Sysadmin | 0.5 | [#1] Part-time sysadmin for infrastructure and ingest. |
| Covert Online Operator / Moderator | 4 | [#15] Foundation-controlled accounts and moderation staff (operators). |
Confidence Notes
Estimates are based on analyst ranges and midpoints; many line items have wide ranges (legal, cyber-forensics, contingency), and SCP behavior/scale could materially change costs, so medium confidence is appropriate.