SCP-451
Euclid
~
medium confidence
SCP-451
Expected annual
$2.5M
One-time setup
$1.7M
Annual recurring
$2.5M
Personnel
23
One-time capital and contingency costs are moderate (~$1.7M) driven by containment retrofit and escalation reserves; recurring annual costs are dominated by specialized security and research staffing, plus readiness/recovery budgets (~$2.49M/yr).
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal year with regular operations, scheduled training and no major incidents.
no_incident
routine_research
scheduled_maintenance
🚨
Minor Incident
$2.6M/yr
Localized incident such as property damage, temporary sensor/lock failures or small legal/PR event requiring repairs and payouts.
small_physical_damage
minor_breach_attempt
local_media_exposure
🚨
Major Breach
$4.0M/yr
Significant containment failure or escalation (SCP-451 accesses other SCPs, large property damage, or artifact-driven incidents) requiring relocation, large recovery ops or major containment upgrades.
escape_attempt
artifact_interaction
major_property_damage
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#1] Two-guard escort 24/7 requiring ~8 FTE (2 guards × 3 shifts + cover). |
| Security Supervisor | 2 | [#2] Senior NCO/officer supervisors for scheduling, liaison and incident management. |
| Psychologist / Psychiatrist | 4 | [#7] Lead psychologist, psychiatrist and behavioral technicians to maintain the mental task and provide crisis intervention. |
| Research Scientist | 4 | [#8, #9] Cognitive neuroscientists and experimental psychologists running containment/communication research. |
| Research Technician | 2 | [#8, #9] Lab technicians for neuroimaging sessions, EEG setup and experiment support. |
| Administrative Staff | 1 | [#17] Administrative FTE (0.25–0.5 FTE estimated; counted as 1 headcount for coordination/documentation). |
| Medical Officer | 1 | [#12] Medical coverage for emergency sedation/medical care and training. |
| Engineer / Maintenance | 1 | [#6, #21] Technical support for robots, sensors, CCTV, and routine maintenance/upgrades. |
Confidence Notes
Notes provide detailed line items and ranges; however many items have wide ranges (artifact recovery, neuroimaging purchase vs rental, contingency sizing) so cost precision is moderate.