Expected annual
$8.2M
One-time setup
$21.1M
Annual recurring
$7.5M
Personnel
36
Initial capital outlays are dominated by secure facilities, heavy-lift equipment purchase, and a large contingency reserve (~$21.2M one-time). Recurring costs are dominated by personnel, R&D and monitoring, and per-test logistics (~$7.51M/year baseline).
🏗️ One-Time Capital Costs Total: $21.1M
Contingency Reserve $10.0M
[#29] Recommended catastrophic/unexpected escalation reserve (one-time funding).
Facilities $3.2M
[#6, #11, #17, #30] Test range/site preparation, reinforced storage/vault construction, perimeter/security installation and long-term decommissioning planning.
Equipment $3.1M
[#1, #8, #10, #18] Secure servers and enclave, high-speed telemetry/observation hardware, purchase of heavy crane/transport fleet, vehicle fleet purchase.
Compensation Fund Initial $1.5M
[#15] Initial covert restitution/compensation fund for civilian property damage and settlements.
Liaison And Records Acquisition $1.0M
[#5] Costs for liaison/negotiation with US Army and procurement of military logs and aircraft data.
Initial Research And Lab Setup $750K
[#3, #12, #21] Initial reverse-engineering effort, material-analysis lab equipment upgrades, and sandbox/simulated ordering environment buildout.
Medical Reserve Initial $500K
[#14] Initial emergency/mortuary/compensation reserve fund.
Disposal Infrastructure $400K
[#27] One-time buildout of specialized infrastructure for disposal/neutralization of recovered cylinders.
Legal And Registrar Operations $150K
[#4] One-time legal actions, registrar negotiations and potential clandestine acquisition of domain/registrant records.
Cover Corp Setup Initial $150K
[#19] Initial setup for shell companies, cover PR infrastructure and deniability operations.
Intelligence Initial $150K
[#20] Initial covert intelligence and investigative operations into registrant identity and attribution.
Training Initial $100K
[#25] Initial development of SOPs, training materials and initial drills/tabletops.
Archive Initial $60K
[#28] Secure archive setup, redaction workflows and translation metadata infrastructure.
Clearance Initial $40K
[#26] Initial vetting and clearance costs (polygraphs, background checks) for core staff.
🔄 Annual Recurring Costs Total: $7.5M/yr
Staff Wages $3.0M/yr
[#16] Dedicated SCP-4510 team salaries (researchers, techs, security, pilots/operators, medics, admin/legal/PR) including overtime and hazard pay.
Research And Monitoring $2.2M/yr
[#3, #12, #20, #23, #24] Ongoing reverse-engineering contract work, contracted material analyses, intelligence monitoring, multi-year R&D program initial tranche, and regional/global monitoring tasking.
Logistics And Transport $1.1M/yr
[#7, #8, #10, #13, #18, #22] Annualized per-test airspace closures, telemetry deployment operations, heavy-recovery rentals per recovery, EOD retainer and per-test operational crew/transport/vehicle operating costs (assumes ~6 controlled tests/year).
Facilities Maintenance $300K/yr
[#6, #11, #17] Annual maintenance of test range infrastructure, vault upkeep and security systems.
Cover Story And Legal $300K/yr
[#4, #19] Annual legal fees, insurance/indemnities, PR/cover story maintenance and shell company operating costs.
Medical And Mortuary Contingency $200K/yr
[#14] Annual contingency for medical care, casualty support and mortuary services.
It Operations And Network Monitoring $170K/yr
[#2] Ongoing IT operations: SOC analysts, bandwidth, patching, backups, intrusion detection and forensic logging for hosted site.
Interception Expected Annual $60K/yr
[#9] Expected annualized contingency for scrambling/interception efforts (low-frequency but high-cost per event).
Eod Expected Per Year $50K/yr
[#13] Expected per-incident EOD and hazardous-incident response costs beyond retainer (annualized expectation).
Disposal Operations Expected $50K/yr
[#27] Expected annual cost for occasional disposal/neutralization operations (annualized).
Training And Protocols $40K/yr
[#25] Annual refresher training, drills and SOP updates.
Clearance And Personnel Reliability $30K/yr
[#26] Ongoing vetting, polygraphs and personnel reliability program costs.
Supplies And Consumables $25K/yr
[#12, #28] Lab consumables (metallography/chemistry) and recurring small archive/redaction consumables.
Archive Recurring $25K/yr
[#28] Ongoing archive maintenance, secure document storage and redaction staffing.
Cost Scenarios
📊 Baseline (baseline) $7.5M/yr
69.0% probability / year
Normal operational year with scheduled tests, routine monitoring, research and no major incidents or public exposures.
planned_controlled_tests routine_monitoring no_public_incidents
🚨 Minor Incident $8.3M/yr
25.0% probability / year +$750K vs baseline
One significant uncontrolled impact or recovery requiring emergency recovery, local compensation and added legal/medical costs.
unsanctioned_drop_in_civilian_area single-recovery_emergency localized_property_damage
🚨 Major Breach $12.5M/yr
5.0% probability / year +$5.0M vs baseline
A larger-scale incident with multiple civilian casualties or high-profile property destruction requiring extensive legal settlement, large-scale recovery and inter-agency negotiations.
multiple_civilian_casualties class-action_lawsuits military_negotiations_needed
🚨 Catastrophic Disclosure $32.5M/yr
1.0% probability / year +$25.0M vs baseline
Large-scale disclosure or catastrophic escalation requiring use of major contingency reserves, nationwide compensation, facility relocation and heavy PR/legal costs.
widespread_public_exposure mass_casualties_or_infrastructure_damage need_for_large-scale_compensation_or_relocation
👥 Personnel 36 total
Role Count Notes
Research Scientist 4 [#16] Laboratory and analysis staff dedicated to reverse-engineering, materials analysis and R&D.
Engineer / Technician 8 [#16] Systems, telemetry, heavy-equipment technicians and network engineers for operations and test deployments.
Security Officer / MTF Agent 12 [#16] Security staff for data center, test range perimeter and vault protection.
Heavy Equipment Operator 4 [#16] Crane and recovery operators required for recoveries and heavy-lift operations.
Pilot / Flight Liaison 2 [#16] Liaison and coordination staff for airspace, military/federal coordination and telemetry aircraft tasking.
Medical Officer 2 [#16] On-site medical staff for test operations and casualty stabilization.
Administrative Staff / Legal / PR 4 [#16, #4, #19] Admin, legal counsel and public relations staff to manage cover stories, registrar negotiations and interagency communications.