SCP-4520
Keter
~
medium confidence
SCP-4520
Expected annual
$2.7M
One-time setup
$5.4M
Annual recurring
$2.7M
Personnel
15
Initial capital (construction, doors, surveillance, vehicle, lab setup, spares, and contingency reserves) is substantial at several million USD; ongoing annual operating costs are driven primarily by staff wages, MTF readiness and transport, and research/monitoring.
One-Time Capital Costs
Total: $5.4M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal operational year with routine containment, no major incidents.
routine_operations
scheduled_research
regular_maintenance
🚨
Minor Incident
$2.8M/yr
Small breach or localized incident requiring MTF deployment and minor repairs/replacements.
small_breach
rapid_response_deployment
minor_repair
🚨
Major Breach
$3.7M/yr
Significant breach causing structural damage, multiple injuries, large repair and legal/cover costs.
door_failure_and_multiple_injuries
partial_cell_rebuild
large_legal_coverup
🚨
Catastrophic Breach
$8.7M/yr
Widespread containment failure necessitating major rebuild, large-scale cleanup, extended MTF operations and significant legal/cover expenditure.
full_cell_failure
multiple_fatalities_or_large_escape
national_exposure
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Site Guards | 6 | [#7] Dedicated on-site security FTE required for Keter-level containment and access control (#7). |
| Monitoring Staff / Watchers | 4 | [#6] 24/7 monitoring requirement for die observation; minimum 3–4 FTE plus coverage (#6). |
| Research Scientist | 2 | [#14] Ongoing anomalous-effect research team (2 FTE) required for study and testing (#14). |
| Medical Officer | 1 | [#12] On-site medic for emergency stabilization and monitoring (#12). |
| IT / Engineer | 1 | [#16] IT/cybersecurity and systems support for CCTV, logging and access control (#16). |
| Administrative Staff / Site Admin | 1 | [#27] Administrative and overhead coordination allocated to SCP operations (#27). |
Confidence Notes
Estimates are based on detailed analyst line items with ranges; however many items have wide ranges and incident costs are highly uncertain for anomalous breaches, so confidence is moderate.