SCP-4521
Safe
~
medium confidence
SCP-4521
Expected annual
$278K
One-time setup
$460K
Annual recurring
$270K
Personnel
6
One-time upfront capital of approximately $460,500 driven by bioterrarium construction, transport, instrumentation, and contingency seed funding. Recurring annual costs approximate $269,900 driven primarily by staff wages, energy, and monitoring/research operations.
One-Time Capital Costs
Total: $460K
Annual Recurring Costs
Total: $270K/yr
Cost Scenarios
📊
Baseline
(baseline)
$270K/yr
Normal operational year with routine experiments, monitoring, and scheduled maintenance only.
no incidents
scheduled research activity
standard maintenance
🚨
Minor Incident
$320K/yr
Localized event such as a pest outbreak, moderate tree health issue, or small-scale equipment failure requiring emergency response and additional testing.
pest outbreak
localized dieback
sensor/rig failure
🚨
Major Incident
$420K/yr
Severe outcome such as sudden die-off, large-scale contamination, or an incident requiring full decommissioning, remediation, legal settlements, and major PR/cover operations.
sudden die-off
major contamination
public exposure requiring settlements
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Botanist | 1 | Principal scientist (approx. 0.5 FTE dedicated to SCP-4521 research; salary prorated into staff_wages). |
| Bioacoustician | 1 | Part-time specialist (approx. 0.25–0.5 FTE primarily for acoustic experimental design and analysis). |
| Research Technician | 1 | Technician for daily experiments, data capture, and equipment maintenance (approx. 0.5 FTE). |
| Arborist / Groundskeeper | 1 | Routine horticultural maintenance and inspections (approx. 0.5 FTE or contracted time prorated). |
| Security Officer / MTF Agent | 1 | Apportioned additional guard time to protect specimen and testing access (~0.5 FTE equivalent apportioned cost). |
| Data Analyst / Archivist | 1 | Part-time analyst for high-rate acoustic/video data curation and archive management (~0.25–0.5 FTE). |
Confidence Notes
Estimates are based on ranges provided in analyst notes and typical site-level costs; many items (transport, build scope, and frequency of inter-anomalous testing) have wide ranges, producing moderate confidence rather than high.