SCP-4627
Keter
~
medium confidence
SCP-4627
Expected annual
$14.2M
One-time setup
$28.3M
Annual recurring
$13.3M
Personnel
36
Initial containment requires sizable capital outlay (SRA hardware and site build) with ongoing annual operating costs driven by specialized staff, SRA maintenance/power, and large contingency/cover-up reserves. One-time capex dominated by SRA purchase/site construction (~$28.3M total); recurring costs dominated by contingency and staffing (~$13.28M/yr).
One-Time Capital Costs
Total: $28.3M
Annual Recurring Costs
Total: $13.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.3M/yr
Normal year with routine monitoring, maintenance, staffing and reserves; no major incidents.
no_manifestations
routine_SRA_maintenance
regular_research_and_readiness
🚨
Minor Incident
$16.3M/yr
Single transient manifestation requiring rapid SRA deployment, limited absorption event, targeted amnestic administration and local cover-up.
single_manifestation
SRA_deployment
limited_civilian_absorption
🚨
Catastrophic Breach
$63.3M/yr
Widespread or high-profile multi-site manifestations with mass absorption, major legal/PR fallout and full contingency activation (site construction, large settlements).
multi-site_manifestation
mass_absorption
national_media_exposure
Personnel
36 total
| Role | Count | Notes |
|---|---|---|
| Rapid Response / MTF Agents | 12 | [#6] 12-person deployment teams kept on-call; wages and hazard pay included in staff_wages. |
| Security Officer / Guards | 8 | [#7] Local site guards and perimeter staff for exclusion zones. |
| Research Scientist | 6 | [#13] Physicists, geometers, spatial-mapping specialists and analysts for ongoing research and modelling. |
| Medical Officer | 4 | [#16] Onsite medics and psychological support staff for personnel and civilian care. |
| Engineer / Maintenance | 3 | [#3, #8] Technical staff for generators, SRA integration, vehicle and equipment maintenance. |
| Administrative Staff | 3 | [#19, #31] Admin, legal liaisons and PR coordination staff included in recurring budgets. |
Confidence Notes
Estimates drawn from analyst ranges and mid-point assumptions; many line items have wide ranges (especially SRA capex, contingency sizing and per-incident costs) and incident probabilities are inherently uncertain for a Keter-class, non-deterministic spatial anomaly.