SCP-4640
Keter
~
medium confidence
SCP-4640
Expected annual
$4.7M
One-time setup
$2.0M
Annual recurring
$4.4M
Personnel
10
Initial setup requires modest facility/equipment outlays (~$2.04M one-time) while recurring annual costs are dominated by personnel, contingency reserves, and community/OPSEC operations (~$4.355M/yr). Major cost drivers are embedded and monitoring staff, the annual contingency reserve, and ongoing R&D/monitoring.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $4.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.4M/yr
Normal, uneventful year with regular operations, training, maintenance, and reserves but no major breaches or extraordinary incidents.
no major manifestations
routine monitoring & upkeep
🚨
Minor Incident
$4.6M/yr
Localized SCP-4640-3 manifestation causing limited property damage or a small witness cluster requiring targeted amnestics and repairs.
small manifestation
localized property damage
field amnestic ops
🚨
Major Breach
$9.4M/yr
Large multi-site SCP-4640-3 manifestations with significant structural damage, civilian casualties, and mass amnesticization and remediation efforts.
widespread manifestations
broken masquerade
mass witness events
🚨
Political Exposure
$5.4M/yr
Legal/political challenge or NGO exposure forcing expensive litigation, extended settlements, and aggressive cover remediation.
press leak or NGO inquiry
local government/legal action
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Field Agent (embedded) | 2 | [#1] Two embedded covert agents posing as guardians (fully loaded). |
| Security Officer / MTF Agent (local monitoring team) | 6 | [#2] On-island rapid-response/monitoring team with rotating shifts. |
| Medical Officer (pediatric/psychiatric) | 1 | [#11] Pediatric/psychological care provider (home visits, emergency triage). |
| Data Analyst / Case Manager | 1 | [#22] Weekly reporting, case file maintenance, incident logs (1–2 FTE equivalent budgeted; counted as 1 here). |
Confidence Notes
Analyst notes provide detailed line-item estimates enabling a structured budget, but several high-cost items (R&D, contingency reserves, breach costs) are inherently uncertain due to SCP anomalous behavior; accordingly confidence is medium.