SCP-4678
Neutralized
~
medium confidence
SCP-4678
Expected annual
$2.3M
One-time setup
$888K
Annual recurring
$2.2M
Personnel
12
One-time startup and contingency funding of $887,500 (locker, recovery, equipment, lab/setup, documentation, and a large contingency reserve). Annual recurring program costs are estimated at $2,200,000 driven primarily by staff wages, specialized readiness/response, per-test operational costs, and administrative overhead.
One-Time Capital Costs
Total: $888K
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Uneventful year with moderate testing cadence (5 tests), routine maintenance, normal staffing and no major incidents.
normal_operations
scheduled_tests
no_incidents
🚨
Minor Incident
$2.6M/yr
Single non-catastrophic incident (subject injury/death or limited containment breach) requiring emergency response, extra legal/cover costs and forensics.
subject_death
localized_containment_failure
unexpected_temporal_side_effect
🚨
Major Breach
$4.7M/yr
Large-scale breach or political/public exposure requiring cross-site response, international ops, large cover-up expenditures and possible site repair/replacement.
major_breach
political_exposure
catastrophic_temporal_event
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | Dedicated guard presence for locker and immediate area; salaries/benefits included in staff_wages [#6]. |
| Research Lead | 1 | Project XN lead researcher; salary included in staff_wages [#7]. |
| Research Scientist | 2 | Project researchers conducting experiments and analysis; salaries included in staff_wages [#7]. |
| Lab Technician | 1 | Lab technician for test setup, instrumentation and sample handling; salary included in staff_wages [#7]. |
| Administrative Staff | 1 | Admin support for Project XN (procurement, scheduling, documentation); salary included in staff_wages [#7]. |
| Analyst / Exploitation Specialist | 5 | Analysts and subject-matter experts for analysis & exploitation of future data; salaries included in staff_wages [#20]. |
Confidence Notes
Many line items are well-specified (locker, recovery, per-test cost ranges, staffing) but the single largest uncertainties are test cadence, chosen contingency sizing, and the frequency/severity of incidents; assumptions (5 tests/year, reserve sizing) drive totals.