SCP-468
Euclid
~
medium confidence
SCP-468
Expected annual
$5.3M
One-time setup
$18.8M
Annual recurring
$5.2M
Personnel
42
Estimated up-front capital and acquisition costs are approximately $13.17M, driven by land acquisition, site construction, and contingency/legal retainer costs. Annual operating costs are approximately $5.14M/yr, driven primarily by security payroll, research payroll, site O&M, legal/cover payments, and long-term care/medical support.
One-Time Capital Costs
Total: $18.8M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal year with routine operations and no major incidents or exposures.
routine_operations
no_incident
🚨
Minor Incident
$5.4M/yr
Occasional civilian/trespasser entry requiring extraction, localized medical response, witness management and limited cover payments.
civilian_entry
extraction_event
witness_management
🚨
Major Breach
$7.1M/yr
Significant infrastructure damage or large exposure requiring reconstruction, major compensation and emergency operations.
infrastructure_damage
large_exposure
mass_casualty
🚨
Political Exposure
$10.1M/yr
State-level discovery or investigation requiring extensive cover payments, legal/diplomatic operations, and probable relocation/acquisition.
state_inquiry
media_exposure
counterintelligence_breach
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#5] 24/7 perimeter coverage with rotation, includes guards and on-site supervisors/team leaders (staffing bump to cover leave/sick). |
| Level-4 Researcher / Project Lead | 1 | [#9] Oversees SCP-468 research and holds containment combination. |
| Research Scientist | 5 | [#9] Senior researchers across disciplines (anthropology, mathematics, neuroscience, structural engineering) - midpoint of 3–6 range. |
| Lab Technician | 4 | [#9] On-site lab technicians for experiments and sample handling. |
| Data Analyst | 1 | [#9] Responsible for data collection, modelling and pattern detection. |
| Veterinary / Animal Specialist | 1 | [#9, #14] Animal handling and quarantine specialist for replacement/experimental animals. |
Confidence Notes
Many line items are mid-range estimates aggregated from broad ranges and covert-cost uncertainty (land value, bribery, and political risk). Technical equipment and staffing figures are better-constrained, but cover/acquisition/legal contingency figures retain substantial uncertainty.