SCP-4683
Euclid
?
low confidence
SCP-4683
Expected annual
$13.7M
One-time setup
$78.7M
Annual recurring
$10.5M
Personnel
34
Initial capital costs are dominated by containment-suite construction, specialized lab and R&D (nexus-dampening) development, and large emergency reserves; annual operations are driven by research, surveillance, and staffing for rapid-response teams, with expected baseline recurring costs in the low tens of millions.
One-Time Capital Costs
Total: $78.7M
Annual Recurring Costs
Total: $10.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.5M/yr
Normal year with October monitoring and routine incidents handled without major escalation.
seasonal October activity
limited localized SCP-4683-1 discoveries
no exponential amplification within a Nexus
🚨
Minor Incident
$11.5M/yr
One or more significant localized episodes requiring extended response: multiple quarantines, mass detainee processing, expanded hazardous disposal, overtime staffing.
clustered SCP-4683-1 discoveries
multiple SCP-4683-A detainees
localized soil/ash remediation
🚨
Catastrophic Breach
$160.5M/yr
Exponential amplification in a Nexus (Nx-18) requiring full-orchard demolition, mass amnestics, evacuation, and long-term remediation with national-level resource activation.
uncontrolled SCP-4683-A amplification
rapid AOV spike in Nx-18
failure of containment suites and need for full remediation
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#5] Rapid-response and perimeter security teams for quarantine enforcement and detainee transport. |
| Hazmat Technician | 6 | [#3, #4, #5] Field incineration teams, PPE/decon specialists, incinerator operators. |
| Research Scientist | 4 | [#8, #11, #12, #13] Nexus research, sequencing/pathology analysis, narrative turbulence R&D. |
| Medical Officer / Nurse | 4 | [#10, #22] Detainee observation, medical testing, long-term care coordination. |
| Evidence Tech / Technician | 2 | [#15] Evidence handling, chain-of-custody, forensic logging and storage operations. |
| Engineer / Maintenance | 2 | [#6, #8, #9] Vehicle, incinerator, containment-suite, and facility maintenance and certification. |
| Administrative Staff | 3 | [#18, #25] Project management, legal liaison, PR, accounting and contractor coordination. |
| Site Director / Executive Staff | 1 | [#8, #23] Oversight, strategic decision making, emergency escalation coordination. |
Confidence Notes
Large ranges in analyst estimates, significant dependence on incident frequency and scale of chosen capital investments (e.g., aircraft purchase vs. charter, size of reserve), and the object's probabilistic/memetic effects make precise costing uncertain.