SCP-4684
Keter
~
medium confidence
SCP-4684
Expected annual
$32.1M
One-time setup
$180.3M
Annual recurring
$31.4M
Personnel
196
Initial one-time establishment costs are dominated by a recommended contingency reserve and a secure joint research facility; annual recurring costs are driven primarily by payroll for embedded surveillance personnel and facility leases/maintenance, resulting in multi‑million dollar ongoing expenses.
One-Time Capital Costs
Total: $180.3M
Annual Recurring Costs
Total: $31.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$31.4M/yr
Normal operational year with ongoing monitoring, research, and limited routine interventions.
no breaches
routine maintenance
scheduled R&D activities
🚨
Minor Incident
$33.9M/yr
Localized containment/response requiring rapid-response deployment, temporary PR/legal actions, and equipment repairs.
localized breach or exposure
targeted rapid-response deployment
limited amnestic distribution
🚨
Major Breach
$91.4M/yr
Large-scale containment failure or international incident requiring emergency reserve expenditure, mass amnestics, reconstruction, and high-level diplomatic/legal action.
widespread breach
significant civilian exposure
international legal fallout
Personnel
196 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 166 | [#3] Two full-time surveillance/observer operatives per post (83 posts). |
| Research Scientist / Thaumaturgist | 15 | [#11, #10] Department of Thaumaturgy core team embedded at joint facility (estimated 10–20; midpoint used). |
| Intelligence Analyst | 6 | [#17] Analysts for OSINT, geolocation, and investigation duties. |
| Remote Data Analyst / Video Analyst | 4 | [#6] Staff to process video/audio ingestion, automated detection oversight. |
| Engineer / Maintenance | 3 | [#10, #13] Technicians for facility, containment-material, and equipment maintenance/repairs. |
| Administrative Staff / Site Support | 2 | [#18, #23] Admin and cover-company accounting/legal support included in payroll. |
Confidence Notes
Estimates are based on analyst-provided ranges and sensible midpoints; thaumaturgic-specific supply needs and contingency sizing introduce substantial uncertainty, while leases and staffing are better-defined.