SCP-4729
Neutralized
~
medium confidence
SCP-4729
Expected annual
$5.9M
One-time setup
$67.3M
Annual recurring
$4.8M
Personnel
17
One-time capital/setup costs dominated by specialized hardware, vault construction, satellite development, and potential orbital debris-removal missions (~$67M one-time in the mid/high option). Ongoing yearly costs are driven by personnel, satellite operations, orbital monitoring, research, and cover/legal operations (~$4.81M/yr baseline), with occasional very costly orbital remediation events.
One-Time Capital Costs
Total: $67.3M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal uneventful year with routine monitoring, maintenance, and research activities only.
no incidents
routine maintenance
periodic research/monitoring
🚨
Minor Incident
$6.3M/yr
Localized containment incident or transport/field accident requiring emergency response, remediation and equipment replacement.
localized containment failure
transport accident
emergency field remediation
🚨
Orbital Removal Mission
$54.8M/yr
Detection of a similar/orbital threat requires a dedicated debris-removal rendezvous/tug mission to clear or intercept an object and conceal evidence.
candidate object detected in orbit
decision to physically remove object
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#9] 24/7 armed security presence and on-site attendants to cover shifts, benefits and hazard pay. |
| Research Scientist | 5 | [#10] Materials scientists, plasma physicists, magnetics/cryo specialists for periodic sampling, analysis and program oversight. |
Confidence Notes
Analyst notes are detailed and map well to discrete hardware and operational categories, but wide cost ranges for space missions, satellite development, and contingency events introduce material uncertainty.