SCP-4728
Unknown
~
medium confidence
SCP-4728
Expected annual
$1.2M
One-time setup
$1.2M
Annual recurring
$1.2M
Personnel
10
Initial one-time setup and reserves are roughly $1.22M driven by land, fencing, facility buildout and contingency tanks; recurring baseline operating costs are roughly $1.18M/year, dominated by personnel (security and researchers) and long-term research/incident reserves.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal operational year with onsite security, ongoing research, and routine maintenance; no major incidents or captures.
no incidents
routine operations
scheduled research activities
🚨
Minor Incident
$1.2M/yr
Small-scale event (public incursion, minor fence damage, short overtime) requiring local response and small repairs.
public encroachment
minor weather/wildlife damage
small medical evacuation
🚨
Public Exposure
$1.6M/yr
Significant public incident or media exposure requiring PR, legal action, compensation, and intensified containment posture.
unauthorized publicity
major public incursion
lawsuit or municipal escalation
🚨
Major Capture And Diagnostics
$1.7M/yr
Active capture/removal and major diagnostic campaign requiring containment tank deployment, mobilization, and extensive veterinary/diagnostic costs.
decision to remove SCP-4728 from pond
invasive diagnostics authorized
unexpected anomalous escalation
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] 24/7 coverage: 4–6 guards plus supervisors (baseline modeled at 6 on-staff to cover shifts). |
| Research Scientist | 2 | [#10] Lead scientist plus 1 assistant(s) for ethology/linguistics and ongoing research. |
| Site Director / Executive Staff | 1 | [#28] Program manager / site lead included in staff wages and management overhead. |
| Administrative Staff | 1 | [#28] Administrative support for procurement, accounting and scheduling. |
Confidence Notes
Article provides specific containment measures and cost ranges for many line items, enabling mid-confidence estimates; however wide ranges, contingency options (passive vs active containment) and locality-dependent land/permit costs reduce precision.