SCP-475
Safe
~
medium confidence
SCP-475
Expected annual
$1.3M
One-time setup
$2.1M
Annual recurring
$1.3M
Personnel
12
Initial one-time containment and infrastructure upgrades are moderate (~$2.07M) driven by a sealed wet-test chamber and a large contingency reserve; ongoing annual costs are substantial (~$1.29M/yr) driven by research, monitoring, and security/staff wages.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with no major incidents; standard research, monitoring, and containment operations only.
routine_operations
no_spills
steady_research_progress
🚨
Minor Incident
$1.4M/yr
Localized containment event (small spill or limited unintended transmutation) requiring response, decon, and limited legal/PR action.
small_spill
localized_water_transmutation
minor_public_exposure
🚨
Major Breach
$2.3M/yr
Significant containment failure or public exposure requiring large-scale remediation, litigation, and emergency operations.
public_exposure
release_into_public_water
large_scale_transformations
🚨
Research Breakthrough Requiring Scale Up
$2.2M/yr
Successful identification/synthesis of the anomalous hydrophilic head leads to purchase of major instrumentation and scale-up facilities.
successful_synthesis
decision_to_purchase_instruments
scale_up_trials
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | [#7] Covers 2–4 assigned guards (midpoint 3) for site-level access control and escort duties. |
| Research Scientist | 2 | [#11, #12] Organic/analytical chemists leading characterization and synthetic programs (1–3 indicated; midpoint 2). |
| Research Technician | 2 | [#3, #17] Lab technicians for remote handling, sample collection, and analytical workflows. |
| Medical Officer | 1 | [#14] Clinical support for pre/post-test physicals and emergency care. |
| Psychiatrist / Counselor | 1 | [#14, #22] Psychiatric monitoring and religious-sensitivity counseling for subjects and staff. |
| Engineer / Maintenance | 1 | [#2, #16] Facilities/maintenance engineer for wet-chamber HVAC, decon systems, and remote-handling upkeep. |
| Administrative Staff | 1 | [#8, #21] Admin support for scheduling, chain-of-custody, and recordkeeping. |
| Site Director / Executive Staff | 1 | [#10, #28] Program management and oversight, fractional FTE captured in program-management budget. |
Confidence Notes
Most items have explicit analyst estimates and clear mappings (facilities, equipment, recurring research), but many costs are presented as ranges and several line items are conditional (optional animal testing, possible instrument purchase), so overall confidence is medium.