SCP-476
Safe
~
medium confidence
SCP-476
Expected annual
$1.9M
One-time setup
$1.0M
Annual recurring
$1.8M
Personnel
8
One-time setup costs total approximately $1.04M driven primarily by equipment, MTF kit purchases and a large contingency/reserve; recurring annual operations are approximately $1.80M/yr driven mainly by personnel (MTF and containment staff), field monitoring, forensic processing, telecom support, and insurance/overhead.
One-Time Capital Costs
Total: $1.0M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal operational year with no major incidents; routine monitoring, experiments, staff costs and maintenance.
routine_monitoring
scheduled_experiments
no_incidents
🚨
Minor Incident
$2.0M/yr
Localized incident (lost-sight event, small civil discovery, or limited anomalous mail event) requiring emergency response, limited payouts and overtime.
localized_public_exposure
limited_cover-up_payments
short emergency_deployment
🚨
Major Breach
$2.8M/yr
Significant containment event (atlas used to move multiple persons or discovered by civilians) requiring extended MTF operations, larger legal/PR payouts and replacement/forensic efforts.
multi-person_movement
extended_extraction
major_public_incident
🚨
Catastrophic Breach
$4.3M/yr
Worst-case scenario with broad public exposure, sustained operations, high-profile legal actions and full-scale contingency activation.
widespread_public_exposure
prolonged_operations
major_legal_liability
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Dedicated 6-person response team (salaries included in staff_wages; 6 x ~$75k base). [#10] |
| Level-2 Personnel / Containment Specialist | 1 | One Level-2 required to oversee experiments and prevent misuse (salary included). [#5] |
| Research Scientist | 1 | Long-term researcher to catalogue locations and analyze data (salary included; represents 1–2 FTE depending on program scale). [#21] |
Confidence Notes
Cost categories and drivers are described in analyst notes and the SCP text, so hardware and recurring personnel/monitoring estimates are moderately well-grounded; several line items used midpoint estimates or assumed counts (e.g., number of field kits, moves/year, buyback volume) which introduce uncertainty, so confidence is medium.