SCP-479
Euclid
~
medium confidence
SCP-479
Expected annual
$2.9M
One-time setup
$2.3M
Annual recurring
$2.8M
Personnel
12
One-time containment and research setup is estimated at approximately $2.34M, driven primarily by contingency/quarantine funds, demolition contingencies, and research pilot costs; annual recurring operations are about $2.82M/yr, driven by staff wages (security + research) and an ongoing advanced research program and monitoring.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal year with no major incidents; ongoing monitoring, research, and routine maintenance only.
no incidents
routine monitoring
scheduled research activity
🚨
Minor Incident
$3.0M/yr
Localized incident requiring extra testing, overtime, short-term medical evaluations and incident response but no breach.
unexpected staff symptoms
temporary increase in neuroimaging/testing
short-term overtime/security surge
🚨
Major Breach
$3.8M/yr
Containment failure or spread requiring emergency quarantine, medical treatments, large-scale incident response and legal handling.
widespread hallucination reports
multiple affected personnel
emergency evacuation/quarantine
🚨
Demolition Decision
$3.8M/yr
Deliberate permanent isolation/removal of Hallway 4 via sealed demolition or burial with contractor engagement and additional cover-up costs.
decision to remove corridor
authorization for demolition
environmental/hazard disposal planning
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] 6 FTE guards (2 per shift × 3 shifts) for continuous corridor watch. |
| ETHB / Key Custodian | 1 | [#1, #4] ETHB on duty retaining keys/operational control of access. |
| Research Scientist | 1 | [#6] Lead scientist dedicated to SCP-479 research. |
| Neurologist / Consultant | 1 | [#6] Neurology/psychology consultant for testing and analysis (may be contract/part-time). |
| Research Technician | 2 | [#6] Two technicians to run experiments, maintain sensors and process data. |
| Administrative Staff | 1 | [#20] Project management/oversight FTE allocation (0.1–0.3 FTE distributed; represented here as 1 headcount for budgeting). |
Confidence Notes
Analyst notes provide specific line-item ranges and staffing models so many costs are well-bounded; uncertainties remain in probabilities of incidents, scope of advanced research scaling, and whether large contingency funds will be allocated, yielding medium confidence.