SCP-4798
Unknown
~
medium confidence
SCP-4798
Expected annual
$26.8M
One-time setup
$247.6M
Annual recurring
$24.6M
Personnel
121
[#30] Routine annual operations ~ $24.4M/yr with major drivers: perimeter/security staffing, aviation charters, leased satellite monitoring, and contingency/legal/easement payments; one-time capital (vehicles, suits, site upgrades) plus optional land buyout and large contingency reserves drive upfront costs (~$247.6M one-time in this estimate).
One-Time Capital Costs
Total: $247.6M
Annual Recurring Costs
Total: $24.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$24.6M/yr
Normal uneventful year with routine monitoring, patrols, and maintenance only.
no breaches
standard patrols
leased monitoring
🚨
Minor Incident
$24.7M/yr
Localized breach / small sterilization event requiring limited mobilization and consumables.
small SCP-4798-C spread
localized sterilization
limited medical cases
🚨
Major Breach
$34.4M/yr
Wider breach requiring multi-day sterilization operations, significant waste disposal, helicopter/airlift and temporary surge staff.
widespread SCP-4798-C expansion
multiple injured/exposed personnel
multi-day ground/air operations
🚨
Catastrophic Breach
$174.4M/yr
Large-scale, fast expansion requiring national-level response, forced evacuations, long-term remediation and ecological mitigation.
rapid SCP-4798-C expansion
mass casualties or environmental destruction
multi-regional response required
🚨
Land Buyout
$142.4M/yr
One-off political/strategic decision to purchase/compensate all affected land (buyout) and settle rights, removing easements.
strategic buyout decision
failed easement negotiations
O5-level directive
Personnel
121 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 80 | [#1] Perimeter patrols and checkpoint staff (three shifts, supervisors) at ~80 personnel. |
| Specialized Containment Team | 24 | [#2] Rapid-reaction/sterilization team (on-call), high-skill personnel. |
| Research Scientist / Field Team | 6 | [#13] Field survey teams and lab analysts for routine biological monitoring. |
| DX-64 Computational Staff | 3 | [#12] Computational scientists/administrators maintaining DX-64 and monitoring outputs. |
| Medical Officer | 4 | [#11] Clinical screening, quarantine and psychiatric follow-up staffing. |
| Administrative Staff | 4 | [#17, #24] Site administration, PR coordination, classified records management and legal liaisons. |
Confidence Notes
Estimates are order-of-magnitude based on analyst line items; many items (land buyout, contingency reserve, catastrophic remediation) are optional or scenario-dependent and several costs are highly uncertain, so medium confidence is appropriate.