SCP-4805
Unknown
?
low confidence
SCP-4805
Expected annual
$10.4M
One-time setup
$18.4M
Annual recurring
$10.2M
Personnel
36
Initial capital expenditure to purchase and convert a defunct mall into Provisional Site-71 is the main one-time driver (~$18.4M). Ongoing annual costs are dominated by personnel (security + research + operations), per-instance processing and disposal, utilities/HVAC, and strategic research totaling roughly $10.18M/yr.
One-Time Capital Costs
Total: $18.4M
Annual Recurring Costs
Total: $10.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.2M/yr
Normal year: containment stable, scheduled research and processing of materializations proceeds as planned with no major incidents.
steady_materialization_rate
no_breach_or_public_exposure
routine maintenance and research
🚨
Minor Incident
$10.7M/yr
Localized containment breach or equipment failure requiring overtime, repairs, and limited external coordination.
localized_breach
generator_or_HVAC_failure
small_medical_surge
🚨
Major Breach
$17.2M/yr
Significant containment failure, mass materializations or a major breach requiring extended response, temporary expansion, and public cover-up operations.
sustained_containment_failure
mass_materialization
extended_medical_response
🚨
Catastrophic Breach
$30.2M/yr
Widespread, prolonged failure (e.g., uncontrolled production, public exposure) forcing large-scale evacuation, long-term expansion, and substantial international legal costs.
region_wide_overflow
public_exposure
requirement_for_national_response
Personnel
36 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#12] 24/7 armed security staff to cover perimeter and internal shifts; count reflects a mall-sized site roster. |
| Research Scientist | 4 | [#10, #9] Principal investigators and senior researchers focused on temporal anomaly research and experiment design. |
| Technician / Lab Tech | 4 | [#10, #9, #19] Lab technicians and instrumentation specialists for temporal experiments, monitoring equipment, and forensic processing. |
| Site Director / Executive Staff | 1 | [#11] Site leadership and executive coordination for Provisional Site-71 operations. |
| Administrative Staff | 3 | [#11, #20] Administrative, procurement, and clerical staff to manage logistics, records, and cover-story coordination. |
| Medical Officer | 2 | [#14] Medical/psychiatric staff for intake exams, emergency care, and ongoing mental-health monitoring. |
| Engineer / Maintenance | 2 | [#5, #6, #26] Site engineers and maintenance personnel for generators, HVAC, and facility systems upkeep. |
Confidence Notes
Estimates are derived from wide ranges in analyst notes and depend heavily on policy choices (retain vs. terminate instances), uncertain production rates, and contingency assumptions; the anomalous/temporal nature of SCP-4805 increases uncertainty.