SCP-4845
Unknown
~
medium confidence
SCP-4845
Expected annual
$425.8M
One-time setup
$2.8B
Annual recurring
$404.8M
Personnel
30
Initial capital to establish Site-169 and related systems is in the low-single-digit billions (major drivers: lunar site construction, launch/transport and crewed lander development). Annual operating costs are hundreds of millions, dominated by insurance/reserve and logistics/wormhole operations.
One-Time Capital Costs
Total: $2.8B
Annual Recurring Costs
Total: $404.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$404.8M/yr
Normal operational year using wormhole for most transport; routine maintenance, monitoring, and cover operations only.
stable_wormhole_operations
routine_maintenance
no_major_incidents
🚨
Minor Incident
$409.8M/yr
Localized anomalous event requiring additional forensic, medical and temporary operational surge.
localized_anomalous_event
temporary_evacuations
extra_forensics
🚨
Wormhole Failure And Conventional Switch
$804.8M/yr
Wormhole becomes unreliable/unusable for cargo; program must pivot to conventional lunar supply and increased launch cadence.
wormhole_failure
increased_launch_campaigns
major_logistics_shift
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 8 | [#9] Scientific staff included in on-site personnel wages for sample analysis and ongoing study. |
| Engineer / Maintenance | 6 | [#9] Structural, life-support, and rover maintenance engineers. |
| Life-support Technician | 6 | [#9] On-site life-support operations and environmental control staff. |
| Medical Officer | 2 | [#9] On-site medical support for personnel rotations and quarantine response. |
| Administrative Staff | 2 | [#9] HR, logistics coordination and program admin included in staff wages. |
| Site Director / Executive Staff | 1 | [#9] Program lead / site director covered by on-site wages. |
| Support Staff | 5 | [#9] Rotating support personnel (cooks, cleaners, mission specialists) included in on-site wages. |
Confidence Notes
Estimates are based on analyst-provided ranges and canonical containment details (wormhole link, lunar site), but major uncertainty remains around wormhole cargo capacity and program scale choices (full lunar base vs wormhole-reliant outpost), so figures are midpoint-based with substantial variance.