SCP-4938
Unknown
?
low confidence
SCP-4938
Expected annual
$27.2M
One-time setup
$50.0M
Annual recurring
$26.3M
Personnel
124
Initial establishment and remediation infrastructure require large upfront capital (approximately $50M), driven primarily by acquisition/refining/waste-storage contingencies; recurring annual operations are sizeable (~$26.3M/yr) dominated by security, medical, logistics, and cover/legal costs.
One-Time Capital Costs
Total: $50.0M
Annual Recurring Costs
Total: $26.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$26.3M/yr
Routine year with standard operations: security, medical care, refining at baseline, and ongoing cover/PR; no major incidents or regulatory exposure.
no breaches
routine surgeries and refining
steady cover operations
🚨
Minor Incident
$31.3M/yr
Localized contamination event or small radiological leak requiring emergency response, increased medical care, temporary PR/legal expenditures, and limited disposal work.
localized radiation leak
small-scale evacuation/cleanup
temporary media exposure
🚨
Major Breach
$51.3M/yr
Significant containment failure or discovery (e.g., substantial uranium yield, regulatory detection) requiring large-scale disposal, legal settlements, facility replacement, and extended emergency operations.
large uranium discovery
major contamination event
external regulatory/legal exposure
Personnel
124 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 90 | [#1] Perimeter checkpoints and roving patrols: ~90 guards covering 12 checkpoints, three shifts, hazard pay included. |
| Medical Officer / Surgical Team | 18 | [#8, #9] Surgeons, anesthesiologists, nurses, radiology techs and support required for on-site lead-lined OR(s) and continual medical care. |
| Research Scientist / Lab Technician | 12 | [#16, #17] Ongoing biological/radiological research staff and lab technicians to run studies and analyze samples. |
| Decontamination / HazMat Technician | 4 | [#6, #7, #4] Staff to operate decon showers, handle contaminated PPE, and manage hazardous effluent and waste processing. |
Confidence Notes
Many line items depend on unknown yields of radioactive/uranium material, covert cover costs, and disposal/regulatory risk; several major items are range-based or contingent, so overall cost confidence is low.