SCP-4983
Unknown
~
medium confidence
SCP-4983
Expected annual
$1.8M
One-time setup
$2.7M
Annual recurring
$1.7M
Personnel
21
Estimated first-year one-time capital and setup costs are approximately $2,688,000 driven largely by property/site remedial work, contingency reserves, and possible permanent containment build-out; ongoing annual operations are estimated at roughly $1,714,000/year with staff wages (security, research, medical) and recurring legal/cover operations as the main recurring cost drivers.
One-Time Capital Costs
Total: $2.7M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal operational year: regular monitoring, maintenance, routine shipments and ongoing research with no major incidents.
no breach
routine operations
scheduled testing and shipments
🚨
Minor Incident
$1.9M/yr
Localized incident at site requiring short-term surge: additional medical response, overtime security, targeted legal/PR activity, extra forensic testing and temporary containment measures.
personnel symptomatic events
small localized exposure
evidence shipment requiring urgent analysis
🚨
Major Escalation
$3.3M/yr
Severe escalation requiring demolition or purpose-built permanent containment, large legal/cover payout and extensive emergency procurement.
containment failure
public exposure
requirement for sealed permanent containment or demolition
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#5] Covert staged local officers and rotating guards to provide 24/7 coverage (includes supervisors). |
| Research Scientist | 4 | [#13] Field investigators, audio analysts, forensics and research staff (multidisciplinary team). |
| Medical Officer / Paramedic | 1 | [#12] On-site medic/paramedic rotation for immediate medical support. |
| Mental Health Specialist / Contract Psychologist | 2 | [#12] Contracted psychologists and counselors for post-exposure and ongoing support. |
| Engineer / Maintenance | 1 | [#3, #4] Maintenance and technical support for site hardening, repairs, and sensor upkeep. |
| Administrative Staff | 2 | [#30] Program manager and administrative support for contracting, budgeting, and compliance reporting. |
| Archivist | 1 | [#13, #29] Archival/historical research and cataloguing of recovered materials. |
Confidence Notes
Estimates are mid-range point values derived from analyst ranges; many items (anomalous behavior, frequency of incidents, need for permanent containment) are uncertain, so confidence is medium rather than high.