SCP-499
Euclid
~
medium confidence
SCP-499
Expected annual
$2.8M
One-time setup
$17.2M
Annual recurring
$2.8M
Personnel
20
Initial capital (one-time) is dominated by construction of a 60 m reinforced, heat-rated containment chamber and associated heavy-lift/engineering systems; recurring costs are dominated by staff wages, HVAC energy/maintenance, and security. Mid-range estimate: ~$17.2M one-time and ~$2.78M/year recurring.
One-Time Capital Costs
Total: $17.2M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal operational year with routine maintenance, staffing, and no major incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$3.1M/yr
Localized equipment failure or medical/thermal incident requiring emergency response, limited repairs and overtime.
localized_equipment_failure
medical_emergency
thermal_spike
🚨
Major Breach
$8.8M/yr
Catastrophic containment-related failure (HVAC collapse, trench/structural failure, or significant security breach) requiring major repairs, equipment replacement, legal/PR response and possible rebuild.
catastrophic_HVAC_failure
daytime_security_breach
structure_failure
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Night Caretaker | 4 | [#12] Night-shift caretaking staff (4 FTE) for feeding, meds and observation. |
| Security Officer / MTF Agent | 12 | [#13] 24/7 security coverage (12 guards) to prevent civilian access and enforce daytime restrictions. |
| Research Scientist | 2 | [#14] On-site scientific staff for monitoring, testing and containment optimization (salaried personnel counted in staff_wages). |
| Engineer / Maintenance | 1 | [#8, #4] Technical staff for HVAC/power/heavy-equipment maintenance and oversight. |
| Administrative Staff | 1 | [#21, #15] Administrative/permit/cover-story coordination accounted for in staff wages. |
Confidence Notes
Line-item ranges and detailed engineering notes provide a solid mid-range estimate, but final capital and recurring energy/HVAC costs are sensitive to measured radiant output and site-specific construction/energy prices, so uncertainty remains.