SCP-5033
Euclid
~
medium confidence
SCP-5033
Expected annual
$1.4M
One-time setup
$5.9M
Annual recurring
$1.4M
Personnel
9
Initial capital outlay is large (~$5.9M) driven by structural blast containment, a remote testing bay, redundant containment and contingency reserves; annual operating costs are substantial (~$1.39M/yr) driven by staff wages, containment maintenance, rapid-response readiness, insurance and mitigation costs.
One-Time Capital Costs
Total: $5.9M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with no major incidents; routine operations, scheduled maintenance, and ongoing research.
no_major_events
routine_maintenance
scheduled_research
🚨
Minor Incident
$1.5M/yr
Isolated 5033-IGUSHA event causing localized damage and cleanup needs but no structural breach.
isolated_5033-IGUSHA_event
localized_structural_damage
minor_public_exposure
🚨
Major Breach
$2.1M/yr
Partial containment failure requiring significant repairs, temporary relocation, and major legal/PR response.
partial_containment_failure
significant_structural_damage
local_authority_discovery
🚨
Catastrophic Breach
$4.9M/yr
Major containment collapse requiring demolition, site rebuild or relocation and large-scale remediation/cover operations.
total_containment_failure
extensive_site_damage
public_exposure_requiring_large-scale_mitigation
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | Four security guards covering 24/7 shifts; ~$45,000/yr each included in staff_wages. [#10] |
| Security Supervisor | 1 | One supervisor to manage shifts and access control; ~$65,000/yr included in staff_wages. [#10] |
| Animal Technician | 2 | Two specialized large-animal technicians for daily care, enrichment, sedation prep; ~$60,000/yr each. [#11] |
| Veterinarian | 1 | Dedicated veterinarian (approx. 0.75–1.0 FTE represented as 1 headcount) for anesthesia oversight and welfare; salary budgeted in staff_wages. [#11] |
| Research Scientist | 1 | One primary research scientist responsible for experimental design and data analysis; salary included in staff_wages. [#12] |
Confidence Notes
Line-item capital and recurring categories are well-described and quantified with ranges, but event frequency (which drives maintenance and incident costs) is uncertain; several estimates use midpoints of wide ranges leading to moderate confidence.