Expected annual
$7.5M
One-time setup
$25.6M
Annual recurring
$7.2M
Personnel
53
Initial capital construction and equipment are concentrated in shielded containment, waste-storage capability, redundant power and specialized equipment (lasers, remote manipulators, detectors), producing an upfront cost of roughly $25.6M; recurring annual costs are driven by security staffing, technical staff wages, energy, waste/disposal and maintenance at about $7.20M/year.
One-Time Capital Costs
Total: $25.6M
Annual Recurring Costs
Total: $7.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.2M/yr
Uneventful year with normal operations, maintenance and scheduled replacements only.
no incidents
regular maintenance
routine staffing levels
🚨
Minor Incident
$8.2M/yr
Localized contamination or equipment failure requiring contractor decontamination and limited replacement of components.
small contamination event
laser or detector failure requiring replacements
limited contractor decon
🚨
Major Breach
$27.2M/yr
Significant contamination, public exposure, major waste/litigation event or major breach requiring long-term remediation and potential public compensation.
major contamination or release
public exposure/regulatory action
long-term remediation/vitrification/relocation
🚨
Repair Attempt
$10.2M/yr
Decision made to attempt remote repair and full remediation via an R&D project and specialized tooling/testing.
policy decision to attempt repair
R&D scale-up for radiation-resistant tooling
simulated repair campaigns
Personnel
53 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 44 | Maintain 12 on duty at all times → ~44 FTEs (3 shifts + cover); salaries fully loaded are the primary driver of security wages. |
| Research Scientist | 4 | Senior nuclear engineers and radiation health physicists (subset of scientific staffing). |
| Radiation Health Physicist / Nuclear Engineer | 2 | Specialists for safety evaluations, monitoring and experimental oversight. |
| Data Analyst / Operator | 3 | Operators/analysts to record and review wavelength/frequency logs and telemetry (2–4 FTEs assumed). |
Confidence Notes
Estimates are midpoints of ranges provided in analyst notes and incorporate contingency reserves; many line items have wide ranges (radiation waste, legal reserves, repair R&D and incident costs), producing moderate confidence rather than high.