SCP-5071
Unknown
~
medium confidence
SCP-5071
Expected annual
$2.8M
One-time setup
$1.7M
Annual recurring
$2.7M
Personnel
17
Initial capital outlays (~$1.7M) are dominated by cryogenic containment hardware, generators/UPS, lab setup and an initial contingency reserve; recurring annual costs (~$2.74M/yr) are driven by specialized staff wages (researchers and 24/7 security), ongoing research/assay costs, cryogen supply, and facility overhead.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Uneventful year: normal operations, scheduled research, and expected maintenance with no major incidents.
normal_operations
scheduled_maintenance
routine_research
🚨
Minor Incident
$2.9M/yr
Localized equipment failure or partial thaw requiring emergency response, repairs, overtime, and limited replacement of consumables or one chamber.
partial_thaw
LN2_supply_interruption
minor_security_breach
🚨
Major Breach
$4.2M/yr
Catastrophic failure or coordinated breach resulting in multiple thawed specimens, major equipment replacement, legal exposure, and an intensive manhunt.
complete_freezer_failure
extended_power_outage
public_exposure_of_remains
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | 24/7 guard presence across three shifts; count derived from the staffing estimate in [#6]. |
| Research Pathologist | 2 | Senior pathologists for anomalous post-mortem work; salaries included in [#8]. |
| Research Scientist | 3 | Anomalous pathology and supporting researchers; portion of [#8]. |
| Biological Technician | 3 | On-site technicians/mortuary attendants for specimen handling and cryo maintenance; based on [#9]. |
| Administrative Staff | 1 | Administrative/legal liaison and evidence cataloguing support; incorporated in recurring staffing budgets ([#12], [#17]). |
Confidence Notes
Estimates are built from analyst-provided ranges using mid-to-conservative selections and institutionally typical staffing models. Major uncertainties remain around chosen containment architecture (LN2 vs -80°C), PoI activity intensity, and the frequency/magnitude of anomalous events — which justifies only medium confidence.