SCP-5087
Thaumiel
~
medium confidence
SCP-5087
Expected annual
$7.4M
One-time setup
$20.0M
Annual recurring
$7.3M
Personnel
6
Initial capital outlay is dominated by the Mk V Temporal Sink purchase/installation and containment chamber construction (total one-time ~$20M). Ongoing annual costs (~$7.27M) are driven by specialized personnel, Mk V maintenance, contingency reserves, energy/cooling, and ongoing R&D/monitoring.
One-Time Capital Costs
Total: $20.0M
Annual Recurring Costs
Total: $7.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.3M/yr
Normal operational year with no major incidents; routine maintenance, staffing, missions and contingency reserves used only for planned activities.
routine_maintenance
scheduled_missions
no_emergencies
🚨
Minor Incident
$7.8M/yr
Localized tether failure or single-mission emergency requiring extra RCT deployments, emergency repairs, and limited legal/PR activity.
tether_failure
emergency_retrieval_mission
🚨
Major Breach
$12.3M/yr
Significant power or containment failure (e.g., sustained power outage), cascade failures of Mk V or chamber systems, multiple lost assets and large-scale remediation/repairs.
extended_power_loss
mk_v_failure
site_damage
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| HMCL Supervisor / Research Lead | 1 | [#6] Senior lead with L-5/5087 clearance responsible for oversight and authorization. |
| Research Scientist / Temporal Scientist | 4 | [#6] Senior temporal scientists assigned to SCP-5087 with required clearances; responsible for experiments and instrumentation. |
| Technician | 1 | [#6] Technical support for Mk V operation, maintenance and experiment setup. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling mid-point budgeting, but many components (classified Mk V pricing, Site-17 existing infrastructure, frequency of missions/breaches) are uncertain; hence medium confidence.