SCP-5088 Safe ~ medium confidence
SCP-5088
Expected annual
$1.2M
One-time setup
$1.2M
Annual recurring
$1.2M
Personnel
12
Estimated one-time setup costs are approximately $1.23M (mainly site acquisition, structural work, and decommissioning contingency); recurring annual costs are about $1.20M driven primarily by security staffing, research program budgets, and contingency/fatality reserves.
🏗️ One-Time Capital Costs Total: $1.2M
Facilities $678K
[#1, #2, #3, #6, #7, #26] Site acquisition/purchase, structural stabilization/remediation, perimeter installation, pool cover, backup power installation, and decommissioning contingency (converted from GBP; midpoint estimates).
Initial Research And Lab Setup $219K
[#11, #24] Instrumentation for testing (DAQ, sensors, cameras) and initial specialized-sensor R&D hardware/equipment.
Contingency Reserve $172K
[#15] Initial contingency/reserve fund for lawsuits, major incident response, and cover-up operations.
Equipment $148K
[#5, #8, #9, #10, #20] Security CCTV/NVR and alarms, one-time emergency medical equipment, rescue/extraction gear, industrial manipulator purchase (if chosen), and initial data-security hardware.
Legal And Permits $17K
[#14] One-time legal fees, planning applications, payments/compensation and cover-story setup costs.
🔄 Annual Recurring Costs Total: $1.2M/yr
Staff Wages $514K/yr
[#4, #12, #8] 24/7 security staffing (6 guards + supervisor), research staff salaries (senior scientist, technicians, part-time engineer), and paramedic retainer.
Research And Monitoring $206K/yr
[#12] Annual research program budget (consumables, experiment time, reporting) for controlled testing and monitoring.
Fatality Contingency Fund $156K/yr
[#25] Annual set-aside/replenishment for major fatality/cover-up operations (autopsy, amnestics, legal handling, cleanup).
Sensors R And D $69K/yr
[#24] Iterative specialized-sensor R&D budget for bespoke detectors and measurement methods.
Medical Aftercare $34K/yr
[#13] Ongoing medical/psychological aftercare, amnestic procedures and follow-ups (aggregated annual budget).
Crime Response $34K/yr
[#19] Annual budget for detention, transport, processing, amnestic events, legal aftermath and minor reparations following breaches.
Contingency Replenishment $31K/yr
[#15] Annual replenishment of contingency/reserve funds after incidents or planned spend.
Training And Security Vetting $28K/yr
[#21] Annual specialist training, emergency drills and background-vetting refreshers.
Facilities Maintenance $22K/yr
[#16] Utilities (electricity/water/HVAC) and routine janitorial/grounds/building maintenance.
Logistics And Transport $22K/yr
[#23] Heavy-object test logistics: transport, lifting equipment rental/storage/disposal on an annual budget.
Heavy Test Logistics $22K/yr
[#23] Operational days for heavy-object tests, including transport and lifting per-year budget (duplicative mapping to logistics_and_transport core).
Site Lease $16K/yr
[#1] Alternative recurring lease cost if purchase is not used (midpoint lease estimate converted from GBP).
Remote Handling Rental $16K/yr
[#10] Budgeted annual crane/remote-manipulator rental days for tests (if not purchased).
Public Relations $13K/yr
[#22] Disinformation/PR budget and local outreach to preserve cover and manage reputation.
Instrumentation Maintenance $12K/yr
[#11] Software licenses, calibration, and maintenance for test instrumentation and DAQ systems.
Security Equipment Maintenance $4K/yr
[#5] NVR/cloud storage, camera maintenance, alarm and sensor upkeep.
Supplies And Consumables $4K/yr
[#18] General consumables and small tools (batteries, cabling, gloves, cleaning supplies, etc.).
Cover Story And Legal $4K/yr
[#14] Ongoing legal retainer, permits upkeep and municipal relations/cover-story maintenance.
Medical Supplies $4K/yr
[#8] Recurring medical supplies (oxygen, AED consumables, first-responder consumables).
Waste Disposal $3K/yr
[#17] Medical and hazardous waste disposal and compliant handling.
Backup Power Fuel Maintenance $3K/yr
[#7] Fuel and routine maintenance for backup generator and UPS systems.
Data Security Maintenance $2K/yr
[#20] Hosting, encrypted backups, audits and records-management ongoing costs.
Ppe Replacement $2K/yr
[#9] Replacement PPE and small rescue-equipment consumables.
Perimeter Maintenance $625/yr
[#3] Annual maintenance for fencing, gates, signage, anti-climb measures and lighting.
Cost Scenarios
📊 Baseline (baseline) $1.2M/yr
73.0% probability / year
Normal, uneventful operational year with no major incidents; routine testing and containment.
no major breaches routine experiments normal staffing and maintenance
🚨 Minor Incident $1.3M/yr
20.0% probability / year +$28K vs baseline
Single trespass or vandalism event causing medical response, small repairs, increased overtime and PR activity.
civilian trespass minor vandalism local media attention
🚨 Major Breach $1.5M/yr
5.0% probability / year +$278K vs baseline
Significant unauthorized access or fatality requiring large-scale emergency response, legal action, cover-up and contingency drawdown.
fatality during breach public exposure large-scale incident response
🚨 Research Scale Up $1.5M/yr
2.0% probability / year +$228K vs baseline
Decision to escalate research (purchase additional equipment, intensive R&D and temporary staffing increases).
promising experimental results approved scale-up specialized equipment procurement
👥 Personnel 12 total
Role Count Notes
Security Officer / MTF Agent 6 [#4] Two guards per shift across three shifts to provide continuous on-site coverage.
Site Supervisor 1 [#4] On-site supervisory role for security and operations.
Research Scientist 1 [#12] Senior scientist leading experiments and analysis.
Research Technician 2 [#12] Technicians to support tests, instrumentation and sample handling.
Engineer / Maintenance 1 [#12] Part-time engineer for equipment, manipulator and facility maintenance (budgeted as part-time).
Medical Officer 1 [#8] Paramedic retainer / on-call medical coverage for rapid response and post-test care.
📋 Confidence Notes
Analyst notes provide detailed ranges and many line items, allowing mid-point estimates; uncertainty remains due to choice between purchase vs lease, incident frequency, and high-variance items (R&D, contingency, decommissioning). GBP→USD conversion used at ~1.25x and midpoints were taken for ranges.
← SCP-5087 ↑ All SCPs SCP-5089 →