SCP-5122
Unknown
~
medium confidence
SCP-5122
Expected annual
$2.9M
One-time setup
$30.0M
Annual recurring
$2.8M
Personnel
10
One-time setup and contingency reserves dominate costs (notably catastrophic reserve and containment room retrofit), while recurring personnel, R&D/monitoring, and legal/OPSEC budgets drive annual expenses.
One-Time Capital Costs
Total: $30.0M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal operational year with no major containment incidents; routine monitoring, R&D, and personnel costs only.
no Bendato Event
routine audits and training
🚨
Minor Incident
$3.1M/yr
Localized Bendato Event requiring incident response, limited hardware destruction, extra legal/PR and temporary operational surge.
single-site Bendato Event
forensic response and hardware replacement
🚨
Major Breach
$3.8M/yr
More serious exposure impacting multiple systems or requiring extended remediation, litigation, and cross-site coordination.
widespread automated scanning by hostile programs
multi-system compromise
🚨
Catastrophic Breach
$12.8M/yr
Worst-case exposure to widely-deployed scanners/AI requiring large-scale remediation, geopolitically sensitive operations, and extensive legal/PR action.
mass automated ingestion by external AI fleets
public exposure / systemic propagation
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Custodian / Curator | 2 | [#6] Two full-time custodians/curators responsible for manual updates, monitoring access logs, and ledger maintenance. |
| IT Security / Systems Engineer | 2 | [#7] One-to-two full-time engineers to maintain air-gapped hardware, integrity checks, and approved patching. |
| Incident Response / Forensics Specialist (retainer) | 3 | [#8] Three on-call/part-time forensics/incident responders maintained on retainer for Bendato Events. |
| Intelligence / GoI Analyst | 3 | [#9] Analysts tracking Groups of Interest and situational awareness per the Bendato Protocol. |
Confidence Notes
Analyst notes provide ranges for most line items and explicit operational requirements, enabling a midpoint-based estimate; uncertainty remains due to wide ranges on contingency/catastrophic funds and site-specific variability.