SCP-5145
Keter
~
medium confidence
SCP-5145
Expected annual
$3.6M
One-time setup
$4.5M
Annual recurring
$3.5M
Personnel
12
First-year capital and setup costs are approximately $4,515,500 one-time, driven primarily by specialized containment hardware, emergency reserves, and bespoke research apparatus; ongoing annual operations are approximately $3,542,000/year, driven mainly by dedicated staff wages, legal/cover operations, and research/monitoring.
One-Time Capital Costs
Total: $4.5M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal year with no major incidents; ongoing monitoring, research and routine operations only.
no breach
regular operations
scheduled maintenance
🚨
Minor Incident
$3.7M/yr
Single isolated incident (one or a few casualties) requiring local response, targeted amnestics and limited cover-up/legal engagement.
isolated accidental proximity
small-scale public exposure
single-site medical/forensic response
🚨
Major Breach
$4.5M/yr
Significant breach affecting multiple personnel/civilians requiring large-scale amnestics, emergency relocation and high-level cover operations.
multi-person exposure
widespread casualties
multi-agency emergency response
🚨
Catastrophic Breach
$13.5M/yr
Rare catastrophic event (large public exposure or cascade leading to mass casualties and major political exposure) requiring multi-million-dollar emergency response and long-term remediation.
mass civilian exposure
publicized casualties
nation-level emergency / multi-site relocation
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Containment Lead | 1 | [#7] Senior officer responsible for containment oversight. |
| Research Scientist | 2 | [#7] Scientists assigned to study behavior and triggers; exclusive assignment assumed. |
| Remote-ops Technician | 2 | [#7] Operators for remote manipulators, drones and sensor systems. |
| Security Officer / MTF Agent | 6 | [#7] Security staff to cover shifts and enforce 50 m exclusion. |
| Engineer / Maintenance | 1 | [#7] Facilities/maintenance technician for generators, UPS, robots and sensors. |
Confidence Notes
Analyst notes provide detailed itemized estimates and midpoints for each line item, enabling a moderately reliable budget; however many items (breach frequency, legal/cover costs, scale of required amnestics) are highly uncertain, so confidence is not high.