SCP-5196
Euclid
~
medium confidence
SCP-5196
Expected annual
$1.3M
One-time setup
$2.3M
Annual recurring
$1.3M
Personnel
11.5
One-time capital costs (~$2.26M) are driven by building a fortified containment chamber, site acquisition, and specialized equipment; recurring annual costs (~$1.33M/yr) are dominated by staff wages, ongoing research/monitoring, maintenance, waste handling, and insurance/contingency.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal operational year with no major incidents: regular staffing, maintenance, research, and waste handling costs.
no major crashes beyond expected
regular maintenance schedule
routine research activity
🚨
Minor Incident
$1.4M/yr
One or more higher-severity crash events requiring above-normal sacrificial panel replacement, contractor call-outs, and additional testing/analysis.
multiple high-energy impacts in a short period
increased bottle generation or localized structural fatigue
🚨
Major Structural Failure
$2.1M/yr
Significant structural failure of containment chamber requiring substantial rebuilding and extended downtime, plus heavy contractor mobilization.
catastrophic breach or repeated extreme impacts
unexpected behavior increasing energy beyond design
Personnel
11.5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Minimum two on-site at all times requiring ~6 FTE to cover shifts, days off, and backup. |
| Research Scientist | 2 | [#14, #16, #29] 2 FTE researchers/engineers to analyze events, maintain instrumentation, and run experiments. |
| Engineer / Maintenance | 1 | [#17, #26] 1 FTE technician/mechanic for barrier servicing, HVAC, conveyors, and repairs. |
| Site Director / Executive Staff | 1 | [#25] Site director role included in administrative overhead. |
| Administrative Staff | 1 | [#25] Administrative support for procurement, scheduling, and recordkeeping. |
| Medical Officer | 0.5 | [#12, #13] Part-time/contract med-tech or nurse (0.25–0.5 FTE range); modeled at 0.5 FTE for ongoing on-call coverage and amnestic administration support. |
Confidence Notes
Medium confidence: analyst notes provide detailed line-item ranges allowing reasonable mid-point estimates, but several items (crash frequency, bottle generation rate, severity distribution) are uncertain and could drive order-of-magnitude variance in replacement, repair, and emergency costs.