SCP-5231
Euclid
~
medium confidence
SCP-5231
Expected annual
$2.3M
One-time setup
$4.2M
Annual recurring
$2.2M
Personnel
11
One-time setup and contingency reserves (~$4.16M) driven by lab build-out, contingency funds, and potential excavation; recurring annual costs are driven by staff wages, political/legal maintenance, and community/monitoring operations (~$2.16M/yr).
One-Time Capital Costs
Total: $4.2M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal year with no major incidents; ongoing monitoring, embedded cover, political/legal maintenance, and routine operations.
no major exposure
regular sensor alerts only
normal community cooperation
🚨
Minor Incident
$2.3M/yr
Localized exposure or several device infections requiring extra forensics, legal responses, PR, and overtime for response teams.
sensor-detected cluster of WAN connections
small public discovery requiring targeted PR/legal action
🚨
Major Breach
$4.7M/yr
Significant public exposure or viral spread requiring emergency legal/PR response, major takedowns, possible excavation/containment attempt and large contingency spending.
public viral spread of WAN content
law enforcement involvement / media storm
decision to perform excavation or large-scale containment
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Embedded Agent (deep cover) | 1 | [#1] One planted Foundation agent living in the community; salary included in staff_wages. |
| Security Officer / MTF Agent (field operatives) | 3 | [#8] 2–4 operatives rotation assumed as ~3 FTEs for 24/7 coverage; salaries included in staff_wages. |
| Research Scientist (malware/memetic lab specialists) | 4 | [#10] Specialist team (3–6) assumed ~4 FTEs; salaries included in staff_wages. |
| Cybersecurity Analyst | 3 | [#11] 2–4 analysts assumed ~3 FTEs for network monitoring/takedowns; salaries included in staff_wages. |
Confidence Notes
Many line items have wide ranges and several large contingencies depend on strategic choices (purchase vs easement, whether to attempt excavation or Faraday deployment). Baseline operational costs are reasonably well-specified; extreme engineering scenarios carry high uncertainty.